Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Airbag Support for Ground Control in Thin Seam Coal MiningBy Fan Shaogang
In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c
Jan 1, 1997
-
Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, ChinaBy W. C. Lacy
Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl
Jan 1, 1989
-
A Pipeliner's Perspective on Longwall MiningBy Robert B. Francini
Longwall mining and pipelines have coexisted since longwall mining was introduced into the United States. How the pipeline operator reacts to longwall mining under their line depends on many factors.
Jan 1, 2011
-
Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)By Nan Hua
As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make
Jan 1, 2009
-
A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining GateroadBy Jennifer Riefenberg
Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern
Jan 1, 1993
-
Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)By R. Karl Zipf
The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o
Jan 1, 1996
-
Geomechanical and Weathering Properties of Weak Roof Shales in Coal MinesBy Hakan Gurgenli
Many coal seams have weak shale immediate roofs that cause ground control problems. Therefore, it is important to know the properties of these shales so that preventive measures can be developed in a
Jan 1, 2006
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and MonitoringBy Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
Front abutment effects on supplemental support in predriven longwall equipment recovery roomsBy Jeffrey M. Listak
This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u
Jan 1, 1989
-
Direct determination of failure surfaces in earth slopesBy S. L. Huang
The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer
Jan 1, 1989
-
The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case StudyBy A. W. Khair
This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan
Jan 1, 1986
-
A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design PremisesBy Thomas M. Barczak
The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a
Jan 1, 2006
-
Finite element analysis and comparison of shaly mine roof support systemsBy K. F. Unrug
In the paper a numerical modeling method is used for evaluation of a roof support system, which is commonly used in the US coal industry. The effectiveness of mechanical roof bolting with or without,
Jan 1, 1989
-
Detailed Stress Analysis of Longwall PanelsBy Khaled Morsy
In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh
Jan 1, 2006
-
Coal Mine Bumps: Case Histories of Analysis and AvoidanceBy David Newman
In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea
Jan 1, 2008
-
Stability Mapping To Examine Ground Failure Risk: A Field Study At A Limestone Mine (b0d73e07-1fdd-41b0-ab9e-b3e15e89a17e)As the surface reserves are being depleted, more and more stone operators are seeking underground mining options. Stability of underground openings is a major concern for the safety and productivity.
Jan 1, 2009
-
Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)By A. T. Iannacchione
Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea
Jan 1, 2009
-
Improved Intersection Design And Monitoring In The Sydney CoalfieldBy G. R. Corbett
The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year
Jan 1, 1995
-
An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring DataBy Pinnaduwa H. S. W. Kulatilake, Biao Shu
The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes
Jan 1, 2015
-
A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger MiningBy Michael Amick
Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro
Jan 1, 2007