Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support SlurriesBy K. Englehardt
J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth
Jan 1, 1991
-
Diaphragm Wall Construction In Hong KongBy Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
The Analysis Of Results From Routine Pile Load TestsBy Bengt H. Fellenius
THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma
Jan 1, 1988
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
Drivability Of Piles By VibrationBy Don C. Warrington
This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving
Jan 1, 1989
-
Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?By G. G. Goble
Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese
Jan 1, 1993
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And StationsBy Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Reliability Of Pile Prediction Methods - SummaryBy M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And CommunicationBy Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow RockBy J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Securing Rail Infrastructure in RomaniaBy Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Environmental Considerations For Foundation Construction In The Boston Area - The New MCPBy James V. Errico
On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts
Jan 1, 1994
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994