Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Innovative Design At Lake LenexaBy Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
Large Diameter Machine Bored Piles In AustraliaBy W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Integrity Testing Of Deep Foundations - SynopsisBy R. T. Stain
Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part
Jan 1, 1987
-
Hyperbolic P-Y Model For Static And Cyclic Lateral Loading Derived From Full-Scale Lateral Load Testing In Cemented Loess SoilsBy Steven Dapp
A new hyperbolic model for generating P-Y curves is developed for use in lateral analyses of cemented soils (a ?C-F? soil with both cohesive intercept and friction angle), and includes degradation of
Jan 1, 2011
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design FormatBy Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Technical VisitBy the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On PilesBy Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
On The Effects Of Sand Grading On Driven Pile PerformancePrecast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental ResultsBy Walter I. Paniagua
Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a
Jan 1, 2007
-
Ground Freezing: The Use of Liquid Nitrogen Systems Converted To BrineBy Joseph A. Sopko
There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th
Jan 1, 2019
-
Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC RegionBy Frank J. Arland
Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p
Jan 1, 2004
-
Doyle Drive - Extreme Pile InstallationBy Peter Faust
The foundations for the new South Viaduct Bridge in San Francisco were extremely challenging due to the requirement for very large and deep piles installed adjacent to historic structures. Drilled sha
Jan 1, 2011
-
A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New MexicoBy SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - SynopsisBy Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Innovative Riverbank Erosion Control Retaining Wall System for the Brazos RiverBy Tracy Brettmann, Will Bohlen
An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban
Jan 1, 2018
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997