Search Documents

  • SME
    An Acoustical Field Comparison Of Hand Drills: Electro-Pneumatic Vs. Pneumatic Jackleg

    By D. R. Zuchelli

    In order for MSHA to require the use of a noise control, the control must be proven ?technologically feasible?. Technologically feasible controls must reduce a miner?s noise overexposure to the permi

    Jan 1, 2011

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME
    Geomechanics

    By Z. T. Bieniawski

    Geomechanics signifies the science and engineering of soil and rock materials and of rock masses. It is a field of professional practice and research that draws heavily on the elements of soil and roc

    Jan 1, 2008

  • SME
    Canadian Companies Make Their Pitch At PDAC

    At the Prospectors and Developers Annual Convention (PDAC) in Toronto, Canada mining and exploration companies of all sizes were on hand to discuss the year that was and those that will be. The follow

    Jan 1, 2009

  • SME
    Water Tunnel in Liaoning Province, Northeast China

    By Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring

    The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra

    Jan 1, 2007

  • NIOSH
    IC 9143 Bureau Of Mines Cost Estimating System Handbook (In Two Parts) 2. Mineral Processing

    This Bureau of Mines report and its companion report (Information Circular 9142) have been prepared to assist in the preparation of prefeasibility type estimates for capital and operating costs of ben

    Jan 1, 1987

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • ISEE
    Measuring Underground Face Drilling and Blasting

    By Thomas Barkley

    Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure

    Jan 1, 2003

  • CIM
    Radon barriers for underground uranium mine use

    By James F. Archibald, H. Jame Hackwood

    "Research was performed to assess the feasibility of barrier membrane substances, for use within mining or associated high risk environments, in restricting the diffusion transport of radon gas. Speci

    Jan 1, 1987

  • CIM
    Regional Structure of the Thompson-Moak Lake Nickel Belt

    By H. D. B. Wilson, W C. Brisbin

    The Thompson-Moak Lake nickel belt lies along the root of a Precambrian mountain range of the island-arc or alpine type. This range coin-. cides with the boundary between the Superior and Churchill bl

    Jan 1, 1961

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • SME
    Proposal for a top-down/bottom-up Approach to build up Indicators of Sustainable Development for Use in the Mining Industry in Africa

    By G. Récoché, A. Chamaret, M. O’Connor

    Building indicators that respond to all stakeholders' needs is a time-consuming and complex exercise, with certain questions still unsolved. The aim of the current three-year research project, ca

    Jan 1, 2005

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • AIME
    Drilling – Equipment, Methods and Materials - Mechanics of Differential Pressure Sticking of Drill Collars

    By H. D. Outmans

    A method has been developed for determining the relative water wet-tability (fraction of the surface wet by water) of porous media. This method involves the adsorption of methylene blue dye from an aq

  • AUSIMM
    Residential Development of Former Quarry Areas on the Port Hills, Christchurch

    This paper focuses on two sites in the Mount Pleasant - McCormacks Bay area of Christchurch where residential development has taken place either within or immediately adjacent to former quarries for t

    Jan 1, 1998

  • AUSIMM
    The Metallurgical Treatment of the Sulpho-Telluride Ores of Kalgoorlie, with Special Reference to Experiments Conducted and Sulphide Mill Erected on the Associated Gold Mines of Western Australia Limited

    The sulphide ores of the principal lodes of the Boulder Mines are mainly composed of a schistose guess with a varying proportion of silica and lime, containing tellurides of gold, silver and mercury,

    Jan 1, 1901

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • NIOSH
    OFR-91-76 Design, Fabrication, And Testing Of A System To Demonstrate The Effectiveness Of Respirable Dust Control On Longwall Shearers By The Use Of Water Piped Through The Shearer Drum ? I. Introduction

    This report is in fulfillment of Contract H0230031 awarded to Bituminous Coal Research, Inc., on May 23, 1973. The scope of work to be performed under this contract was divided into four phases: Phase

    Jan 1, 1976

  • SAIMM
    Shear band propagation in soft rocks: numerical simulation of experimental results

    By M. Castelli, C. Scavia, S. Marello, A. Allodi

    ABSTRACT – This paper investigates the possibility of interpreting the shear band evolution in hard soils and soft rocks as the result of shear propagation from pre-existing natural defects. Thesis do

    Jan 1, 2003

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005