Search Documents

  • CIM
    Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the World

    By Gunnar Nord

    Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti

    May 1, 2009

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • SME-ICGCM
    Impact Of Vertical Stress On Roadway Conditions At Dartbrook Mine

    By Ken Mills

    A program of stress change and roadway deformation monitoring was undertaken to measure the forward abutment load distribution about a retreating longwall panel at Dartbrook Mine. The results of this

    Jan 1, 2000

  • SAIMM
    Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold Mine

    By D. F. Malan, Y. Jooste

    "SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac

    Jan 1, 2015

  • AUSIMM
    Mount Morgan Practice in Recording and Estimating Ore Tonnages and Values

    THE irregularity of the Mount Morgan ore body presents problems other than those for mining only. For irregularity of outline is coupled with irregularity of grade, and the ore varies so rapidly from

    Jan 1, 1910

  • ISEE
    Well Casing - Another Problem Solved Through the Uses of Explosives

    By Jerry Wallace

    The goal: At an industrial site, sever a well pipe containing an interior obstruction in a timely, cost effective manner by using a shape-charge to cut through the casing more than 50 meters below gro

    Jan 1, 2000

  • NIOSH
    RI 8248 Dust Control on a Longwall Face With a Shearer-Mounted Dust Collector

    By Natesa I. Jayaraman

    A field study was conducted by the Bureau of Mines to determine the feasibility and effectiveness of a secondary ventilation system retrofitted onto an Eickhoff EDW 340L double-drum shearer as a techn

    Jan 1, 1977

  • AUSIMM
    Technology of Titanium

    The production of metallic titanium and titanium-rich alloys in forms useful to the engineer involves the use of certain techniques not usually necessary in fabricating the commoner metals and alloys.

    Jan 1, 1950

  • AUSIMM
    Borehole Ropeways at No 2 Ore Shaft, Mount Isa Mines Limited

    The No. 2 Ore-shaft, at Mount Isa Mines Limited, involving the use of boreholes as ropeways for the upper portion thereof, constitutes, we believe, a unique feature in hoisting installations. The bore

    Jan 1, 1939

  • NIOSH
    OFR-47(9)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 9. Viability And Diversity Of The Seed Bank

    By Louis R. Iverson

    Analysis of seed numbers present in topsoils (a grazed area, an ungrazed area, and two stockpiles) indicated that seeds of the most prevalent colonizers (e.g., Kochia scoparla, Setaria virdis, and Sa

    Jan 1, 1982

  • SME
    The Potential Of GPS Guidance In The Mining Industry

    Recent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad

    Jan 1, 2004

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013

  • SAIMM
    A review of information on the influence of plan curvature on rock slope stability and its effect on the volume of wedge failures

    By R. Armstrong

    The stability of rock slopes is significantly influenced by their curvature in plan view. The importance of this in open pit mining is indicated by the fact that, in a deep pit, steepening of the slop

    Jan 1, 2003

  • AIME
    Zonal Relations of the Lodes of the Sumpter Quadrangle

    By D. F. Hewett

    CONTENTS PAGE Introduction 1 Geologic features of eastern Oregon 2 Geology of the Sumpter quadrangle 2 Rocks older than the ore deposits 3 Rocks younger than the ore deposits 8 Lodes of the S

    Jan 1, 1931

  • SAIMM
    Liquid-Liquid Extraction and Separation of Copper(II) and Nickel(II) Using LIX®984N

    By N. B. Devi

    The extraction of copper(II) from sulphate solution was investigated using LIX®984N in kerosene. The parameters that could affect the extraction, such as equilibrium pH, extractant concentration, salt

    Jan 1, 2014

  • CIM
    Valorisation of Thermal Residues by Intensified Mineral Carbonation

    By D. Ling, Santos. R. M., T. Van Gerven, M. Guo

    The valorization of alkaline waste materials from thermal processes utilizing intensified mineral carbonation routes is investigated. The principal advantages of this approach are the chemical stabili

    Jan 1, 2011

  • SME
    Out of the Comfort Zone: Quantifying Country Risk for Foreign Mining Project Investment Feasibilities - Mining, Metallurgy & Exploration (2021)

    By MATT RENAUD, Mustafa Kumral

    As high-quality mineral deposits are thoroughly exploited, mines of the future will have to move towards more remote and lower quality projects. With these projects comes an increased business risk to

    Sep 30, 2021

  • ISEE
    Precision Presplitting Optimization

    By Anthony J. Konya, Calvin J. Konya

    Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya

    Jan 1, 2016

  • SME
    Lineament Analysis: Identification Of Structural Controls On Ground Instability In Surface And Underground Mines (b5ba2cd3-4de8-4cb0-9e01-83ff5030f620)

    By S. E. Phillipson, P. L. Tyrna

    Lineament analysis, a remote sensing application for geological structures, has been criticized for reliance on subjective interpretations. The Mine Safety & Health Administration’s Roof Control Divi

    Jan 1, 2002