Search Documents

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • AUSIMM
    Milling Practice at the Central Mine, Broken Hill, N.S.W.

    CENTRAL mine ore consists mainly of galena and marmatite in a siliceous and rhodonitic gangue, the average assay values being approximately 11.5 oz. per ton Ag, 14.5% Pb, 14.5% Zn, 1.3% Ox Pb, 0.3% Ox

    Jan 1, 1931

  • SME
    (R)evolution in Mining – Implications For Exploration

    By Murray W. Hitzman

    Two great revolutions in mining occurred during the 20th century. The first took place almost 100 years ago (1903-1905) with Daniel Jackling’s experiment in the economies of scale for large-scale min

    Jan 1, 2005

  • CIM
    Bubble Surface Area Flux: A Parameter to Characterize Flotation Cells

    By R. Filippone, Donald Leroux, Colin Hardie, G. Leichtle, Cesar Gomez, Jim A. Finch

    "Bubble surface area flux (Sb) is the surface area of bubbles per unit time per unit cross-sectional area of flotation machine. The units are: (m2 bubble surface/s)/(m2 cell) or s -1. For bubbles of m

    Jan 1, 1999

  • NIOSH
    RI 6069 Resource Investigation And Leaching Study Of Manganiferous Schists, Kings Mountain District, North And South Carolina ? Introduction And Summary

    By J. F. Neill, O&apos

    The manganiferous schists occurring in the vicinity of Kings Mountain, North and South Carolina, suggest significant tonnages of potential submarginal ores. Although some reconnaissance work in connec

    Jan 1, 1962

  • AIME
    Rock Mechanics Studies In A Mechanized Longwall Coal Mine

    By Paul H. Lu

    Methods and results of measuring three basic parameters for ground stability control, ground pressure, strata movement, and geomechanical properties of mine rock are presented in this paper. It is fou

    Jan 1, 1984

  • ISEE
    Ontario Hydra T.G.S. Chimney Demolition Thunder Bay, Ontario, Canada

    By Ray Jambakhsh, Gabrielle Bourget

    In the summer of 1998, Ontario Hydro awarded a contract to demolish an obsolete and inefficient chimney by blasting. The Ontario Hydro Thunder Bay Thermal Generating Station (T.G.S.), is a fully opera

    Jan 1, 2000

  • NIOSH
    RI 3165 Re-Treatment of Fine Washed Coal from the Black Creek and Mary Lee Beds on Coal Washing Tables

    By R. Q. Shotts, H. J. Hager, A. C. Richardson, G. D. Coe

    "INTRODUCTION In the State of Alabama few mines produce coal clean enough to be marketed directly without being washed. This is particularly true where the coal is to be used for the production of met

    Apr 1, 1932

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Impact of Air Distribution Profile on Banks in a Zn Cleaning Circuit (7e803669-0db8-4622-9392-dbc63c206bdb)

    By R. Dahlke, J. A. Finch

    "A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick Mine Concentrator to investigate the role of gas (air) superficial rate distribution (Jg profile) to the cells in the

    Jan 1, 2004

  • SME
    Mine Planning Software Models Empire Mine Ore

    By Allan E. Koski

    Ceveland-Cliffs uses a specialized software package in mine planning at the Empire Mine, an iron ore mine it manages on Michigan’s Marquette Iron Range. The application puts together years of mining

    Jan 1, 2000

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • ISEE
    High Performance Throw Blasting with i-kontm Electronic Detonators in an Environmentally Sensitive Area at Stratford Coal, NSW, Australia.

    Henry Walker Eltin (HWE) are the mining contractors for Gloucester Coal at Stratford mine, which is in an environmentally sensitive area in the Avon Valley, NSW, Australia. Normal blasting at Stratfor

    Jan 1, 2003

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • CIM
    Gold: The Unrivalled Medium of Exchange

    By H. C. Cooke

    THE gold mining industry, in Canada as in other countries, has passed through trying times in the past year. The strains and stresses of war have drawn away much of its man-power, both from the labour

    Jan 1, 1943

  • AUSIMM
    Planned Preventive Maintenance

    The development and introduction of a preventive maintenance scheme in the coke ovens department, coal preparation section, of The Broken Hill Proprietary Co. Ltd., Newcastle steelworks, is described

    Jan 1, 1961

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • AUSIMM
    Boring a Slime Dam

    By Met B

    IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum

    Jan 1, 1928

  • IIMP
    Integración del proyecto Antapaccay con el cierre progresivo de las operaciones de Tintaya

    By Luis Espinoza

    La unidad minera Tintaya al igual que la Unidad Minera Antapaccay, son las operaciones de la división Perú de Xstrata Copper dedicados a la producción y comercialización de concentrado y cátodos de co

    Sep 21, 2013