Search Documents

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • SAIMM
    Simulation of the mechanical behaviour of a fracture in shear: implication of the distribution of the void space

    By J. Riss, S. Gentier, A. Marache

    The study of the hydromechanical behaviour of fractured rock masses requires a detailed knowledge of the isolated fractures. The aim of the paper is the simulation of the evolution of the void space,

    Jan 1, 2003

  • SAIMM
    The Impact Of Platinum Production From UG2 Ore On Ferrochrome Production In South Africa (28793553-1165-4bde-b447-a1dd7203cf06)

    By L. A. Cramer

    South African platinum mines produce the world?s majority of platinum metal that is used in autocatalysts and jewellery. As the platinum market is forecast to grow at healthy rates into the future, th

    Jan 1, 2004

  • NIOSH
    RI 3227 Trade Trends In The Lime Industry ? Introduction

    By Paul Hatmaker

    Lime was a highly useful commodity thousands of years before the simple chemistry of its manufacturing process was known. The employment of lime for agriculture, building, and even certain essentially

    Jan 1, 1934

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • SAIMM
    Geotechnical Investigation Of Decline Shaft Portals

    By R. A. Puchner

    The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned

    Jan 1, 2009

  • SAIMM
    Geotechnical Investigation Of Decline Shaft Portals (98716578-d9a6-4b5f-b3d0-51b497360883)

    By R. A. Puchner

    The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned

    Jan 1, 2009

  • SAIMM
    The Corporate Cost Of Capital

    By E. V. Lilford

    Equity investors and project sponsors have divergent views about expected or minimum returns that should be generated by a mineral project. Irrespective of their views, the fundamental estimation of t

    Jan 1, 2006

  • AUSIMM
    HYL Self-Reforming Technology: Start-Up and Operation

    By Becerra J. O

    HYL developed a direct reduction process (DR) that does not require a reformer; it is called self-reforming process. Typically, direct reduction processes based on natural gas utilise a reformer un

    Jan 1, 1999

  • TMS
    Novel Technology for Treatment of Acidic Wastewater Containing Mercury in Zinc Smelter by Biologics

    By Qingwei Wang

    This study focused on acidic wastewater from producing sulfuric acid system in zinc smelter containing mercury 21.48mg/L, zinc 55.85mg/L, lead 38.50mg/L, copper 1.68mg/L, cadmium 10.25mg/L, As 29.86mg

    Jan 1, 2009

  • CIM
    Flash Flotation Circuit Design Considerations

    "The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa

    Jan 1, 2017

  • SME
    Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007

    By W. D. Monaghan

    Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha

    Jan 1, 2009

  • AUSIMM
    Fundamentals to Produce Fe-Mn Alloy by Smelting-Reduction Process

    By da Silva C A, Tenorio J. A S, de Assis R M, de Oliveira J R

    For Fe-Mn alloy production, two reactions are responsible for this process: the MnO reduction in the slag and the carbon dissolution in the bath. The smelting-reduction process has been studied as a

    Jan 1, 1999

  • AUSIMM
    Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes Deposit

    By D Craw, L Cox, R J. Norris

    The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to

    Jan 1, 2005

  • AUSIMM
    Predicting iron ore sinter strength through X-ray diffraction analysis

    By M I. Pownceby, N A. S Webster, R Pattel, N Ware

    The decrease in quality of Australian iron ore, coupled with the demand for more efficient energy use, necessitates closer monitoring and optimisation of process conditions for iron ore sinter product

    Jul 24, 2017

  • TMS
    Barite Mineralization In Volcanic Rocks In Southern Flank Of East-Magnitogorsk Palaeoisland Arc (South Urals)

    By Natalya. N. Ankusheva

    The problems of ore-bearing palaevolcanic structures in folded belts are actual because of their high productivity in nonferrous, ferrous and noble metals ores. Now relationships of location and condi

    Jan 1, 2006

  • CIM
    53rd Annual Conference of Metallurgists - Conference Proceedings

    "WELCOME/BIENVENUE TO THE COM 2014 IN BEAUTIFUL VANCOUVER!On behalf of the organizing committee, I would like to extend my thanks to you for participating in this year’s Conference of Metallurgists. R

    Jan 1, 2014

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • SME
    Geotechnical Investigations for Tunneling in Glacial Soils

    By David Chapman, Glen Frank

    Due to the transport mechanics of the depositional environment, glacial soils display a very wide range of grain sizes and behavior. Several nonstandard drilling, sampling, and analytical techniques a

    Jan 1, 2001