Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
By Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Haul Truck Safety And Virtual Environments Training
By A. Schaum
On average, there are approximately 10 fatal haul truck accidents per year. The most common causes for haul truck accidents include mechanical problems, inadequate training and insufficient road/berm
Jan 1, 2008
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill Data
By Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Technology News – Excavators Designed for Use in Confined Spaces
Komatsu America International has introduced two new hydraulic excavators. They can work in congested and confined areas. The tight tail swing radius of the PC128US-2 and PC22-8USLC-2 enables the exc
Jan 1, 2000
-
Geochemical types of sulfide ore as indicators of mineral evolution at the hydrothermal vent field Jubileynoye (MAR)
By Anna Sukhanova, Svetlana Babaeva, Sergey Andreev, Victor Beltenev
"The Zenith-Victoria /1/ and Jubileynoye /2/ hydrothermal fields have symmetrical structural position on the Mid Atlantic Ridge (Fig. 1). In order to compare the evolution of hydrothermal systems, we
Sep 1, 2014
-
New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations
By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler
Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1
Jan 1, 2005
-
Waste Dump Site Selection By Using Fuzzy Vikor
By A. Yazadni-Chamzini
Considering the nature of open pit mines, harvest volume, it usually is required to remove a lot of waste to access to mineral planned grade. So, one of the most important part of open pit mines desig
Jan 1, 2012
-
Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India
By Alok Garg, Rajeev Kumar Dayal
The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric
Jan 1, 2001
-
New Miner Training for the 21st Century
By Daniel H. McClain
A unique partnership between the Colorado Mine Safety and Training Program (CMSTP), the Colorado Rock Products Association (CRPA) and the Higher Education and Advanced Technology (HEAT)Center resulted
Jan 1, 2003
-
Palygorskite (Attapulgite) In Central China - Preprint 09-035
By H. H. Murray
The largest reserves of palygorskite in the world are located in Anhui and Jiangsu Provinces in East Central China. The deposits are Middle Miocene in age and range from 3 to 6 m in thickness. The d
Jan 1, 2009
-
A Review Of The Analysis Of Amphibole Fibers
By K. A. Allison, D. R. Van Orden, R. J. Lee
Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici
Jan 1, 2005
-
An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement Suspensions
By Christian Wawrzyniak
An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California
By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Banning Cyanide Use at McDonald – An Attack on Open-Pit Mining
By Richard H. De Voto
The McDonald gold project and two satellite gold deposits near Lincoln, MT were discovered in the early 1990s. They contain at least 307.9 t (9.9 million oz) of gold and 933 t (30 million oz)of silve
Jan 1, 2000
-
Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS
By Poltak Sinaga
PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w
Jan 1, 2008
-
Design of the Epping to Chatswood Rail Line, Sydney, Australia
By Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005
-
State-of-Art Grouting Remedy for Ground Improvement
By Faruk Oksuz, Cary Hirner, William A. Rochford
Grouting is a frequently utilized remedy in the planning and implementation of ground improvement and tunnel rehabilitation practice. The state-of-art grouting application used for Chicago’s McCook Re
Jan 1, 2005
-
Discussion - Development of the Screen Bowl Centrifuge for Dewatering Coal Fines Technical Papers, MINING ENGINEERING, Vol. 35, No. 4 April 1983, PP. 333-336
By N. D. Policow, J. S. Orphanos
D.A. Dahlstrom In the paper, a comparison was made between flowsheets using the screen bowl centrifuge and disc filters, respectively, as the primary dewatering device. The authors very effectively
Jan 12, 1983
-
Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station Project
By James McNally, Adam Stremcha, John MacGregor
With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i
Jan 1, 2007
-
Capillary Cover Design For Leach Pad Closure
By K. Burke, G. Zhan, A. Mayer
A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil
Jan 1, 2001