Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Antiscalants For Gold Processing Applications
By W. H. Dickinson
The performance of seven antiscalants spanning a range of chemistries was evaluated for control of calcium carbonate (CaCO3) formation in gold processing applications. Three preferred chemistries were
Feb 27, 2013
-
Closing the Historic Alaska-Juneau Mine
By Joseph L. Petrillo
In July 1997, Kvaerner Environmental signed a unique contract with Echo Bay Alaska called the Transfer Risk and Accelerate Closure (TRAC). The contract called for Kvaerner to assume the responsibilit
Jan 1, 1999
-
Deterministic And Stochastic Water Balance Modeling Of The Gilt Edge Mine Superfund Site, South Dakota
By K. Wangerud, B. S. Caruso
A water balance model with deterministic and stochastic components was developed and used for the Gilt Edge Mine Superfund Site, South Dakota, to evaluate risks of contaminated runoff discharging to s
Jan 1, 2002
-
Innovative Precipitation-Flocculation Process for Treating Turbid Waters from Gualaxo do Norte River, Brazil Mining, Metallurgy and Exploration
By H. A. Oliveira, A. Azevedo
Physical and chemical characterization and solid/liquid separation of turbid waters from a river affected by an iron tailing rupture disaster (Gualaxo do Norte River, Brazil) were studied at bench sca
-
Innovative Precipitation-Flocculation Process for Treating Turbid Waters from Gualaxo do Norte River, Brazil Mining, Metallurgy and Exploration (9ea0be5c-dee1-4a93-a1ee-3cfd2aa5bfaf)
By H. A. Oliveira, A. Azevedo
Physical and chemical characterization and solid/liquid separation of turbid waters from a river affected by an iron tailing rupture disaster (Gualaxo do Norte River, Brazil) were studied at bench sca
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)
By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration
By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
New Technology In Shaft Sinking The Craig Project (881ea9c2-d5ae-480c-bdfb-c660ed52f398)
By W. R. Dengler
Dynatec Mining Limited contracted to sink a lS00 metre (4960 ft.) concrete lined shaft for Falconbridge Nickel Mines in Sudbury, Ontario, Canada. The shaft is 6.3 metres (20.S ft.) in diameter inside
Jan 1, 1992
-
Design of the University Link Tunnels and Stations
By Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008
-
Novel Coal Collector Derived From Pine Tree Pulping
By J. Hines
Traditionally, fuel oil or diesel was the collector of choice in coal flotation, but in recent years these materials have come under increased scrutiny because of concerns about the toxicity of some c
Jan 1, 2011
-
Water Tunnel in Liaoning Province, Northeast China
By Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring
The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra
Jan 1, 2007
-
Canadian Companies Make Their Pitch At PDAC
At the Prospectors and Developers Annual Convention (PDAC) in Toronto, Canada mining and exploration companies of all sizes were on hand to discuss the year that was and those that will be. The follow
Jan 1, 2009
-
Characteristic Curves Revisited: A More Logical Approach to Determining Operating Points – Preprint 97-53
By L. M. English, Y. J. Wang
When plotted as head vs. volume, fan curves start high and decrease in head with increasing volume while mine head curves start low and rise with increasing volume. Their intersection is the system op
Feb 24, 1997
-
Influence of Trailing Cables on Magnetic Proximity Detection Systems Mining, Metallurgy and Exploration
By Jacob Carr, Chenming Zhou, Nicholas Damiano, James Noll, Jingcheng Li
Machine-related injuries are one of the major safety concerns in underground coal mines. Severe injuries and fatalities occur when a miner is struck, crushed, or pinned by mining equipment such as a c
-
Proposal for a top-down/bottom-up Approach to build up Indicators of Sustainable Development for Use in the Mining Industry in Africa
By G. Récoché, A. Chamaret, M. O’Connor
Building indicators that respond to all stakeholders' needs is a time-consuming and complex exercise, with certain questions still unsolved. The aim of the current three-year research project, ca
Jan 1, 2005
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking
By Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008
-
Guadarrama Tunnel Construction with Double Shield TBMs
By F. Mendaña
The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented
Jan 1, 2007
-
An Acoustical Field Comparison Of Hand Drills: Electro-Pneumatic Vs. Pneumatic Jackleg
By D. R. Zuchelli
In order for MSHA to require the use of a noise control, the control must be proven ?technologically feasible?. Technologically feasible controls must reduce a miner?s noise overexposure to the permi
Jan 1, 2011
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History
By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Design Risk Mitigations for Contract CQ028 of the East Side Access Project
By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007