Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Principles of an image-based algorithm for the quantification of dependencies between particle selections in sampling studies - Synopsis
By D. S. Dihalu
A generalization of Gy?s model for the fundamental sampling error introduced the new ?parameter for the dependent selection of particles?, denoted as Cij. This allows for modeling deviations from the
Jan 1, 2010
-
Analysis for pillar extraction potential (A-PEP)—a risk-based program for underground coal mining
By G. H. Lind
Research into the safe and economic extraction of underground coal pillars in the Witbank and Highveld coalfields of South Africa highlighted that future practices will have to consider pertinent risk
Jan 1, 2003
-
Estimation of Rock Strength From Quantitative Assessment of Rock Texture
By C. A. Ozturk
The compressive strength of rock (sc) has an important effect on design of structures in rock engineering. Compressive strength can be determined in the laboratory using the uniaxial compressive stren
Jan 1, 2014
-
Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for Displacement
By D. Fenn, A. du Kanda, D. Dukhan
"SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen
Jan 1, 2015
-
Grab sampling for underground goldmine grade control ? Synopsis
Geologists in some underground gold mines collect grab samples from broken ore piles or trucks as a method of grade control. It is often known as muck sampling. Generally, the goal of grab sampling is
Jan 1, 2010
-
Research Into Melting And Casting Of Brass Scrap For Upliftment Purposes
By M. Moseki
Paper written on project work carried out in partial fulfilment of B.Sc. (Eng.) (Metallurgy of Materials) degree This paper presents the research into melting of scrap for job creation purposes in
Jan 1, 2002
-
An Approach To Confidently Predicting Jigging Performance
By Grant Loveday, Vincent Dieudonné, Andrew Jonkers
Bateman Minerals & Metals supplies the APIC Technologies which include the under-bed air-pulsed APIC jig and related technologies such as the JigScan controller and advanced mathematical models of the
Jan 1, 2006
-
Dealing With Open Fire In An Underground Coal Mine By Ventilation Control Techniques
By N. Sahay
Open fire in coal mines is one of the most serious threats to miners, as well as to the mine. Open fire can often be effectively dealt with by prompt local action, otherwise it very quickly becomes un
Jan 1, 2014
-
Blast optimization at Kriel Colliery - Synopsis
By A. M. Neale
Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe
Jan 1, 2010
-
Quantitative Rockburst Hazard Assessment At Elandsrand Gold Mine
By F. Essrich
A quantitative rockburst hazard assessment procedure was introduced on Elandsrand Gold Mine at the end of 1994. It is currently used to evaluate the seismicity-related risk in production areas on the
Jan 1, 1997
-
Optimizing Value on a Copper Mine by Adopting a Geometallurgical Solution
By A. S. Macfarlane
This paper describes how knowledge of the orebody morphology and ore morphology can be used to optimize the planning, mining, and metallurgical output from an open pit copper mining operation, such as
Jan 1, 2014
-
Pit Wall Failures On ?Unknown? Structures
By Phillip M. Dight
A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact
Jan 1, 2006
-
The Effect Of Potassium Impregnation On The Boudouard Reactivity Of Selected Single-Source And Commercial Cokes
By T. Lindstad, J. Kaczorowski
The Boudouard reactivity of single cokes produced from selected bituminous coals and commercial cokes has been investigated in a thermo gravimetric furnace. The effect of potassium as a catalyst for t
Jan 1, 2007
-
Stochastic simulation for budget prediction for large surface mines in the South African mining industry
By V. S. S. Yadavalli, J. Hager, R. Webber-Youngman
"This article investigates the complex problem of a budgeting process for a large mining operation. Strict adherence to budget infers that financial results align with goals. In reality, the budget is
Jan 1, 2015
-
Shaft Excavation Method In Soft Soil ? Synopsis
By F. N. F. le Roux
This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R
Jan 1, 2009
-
Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)
By F. N. F. le Roux
This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R
Jan 1, 2009
-
Management Of Copper Pyrometallurgical Slags: Giving Additional Value To Copper Mining Industry
By J. C. Carrasco, M. Sánchez, R. Jara, F. Marquez, F. Parada, R. Parra, J. Palacios
In past years, Chile has been the largest copper producer in the world and for 2002 mining represented country average of 10 % of the GDP, accounting for 47 % of the total exportation. As copper sul
Jan 1, 2004
-
Comparison Of Globoid And Cylindrical Shearer Drums? Loading Performance
By M. Ayhan
Drums of a modern longwall shearer are manufactured to include various constructional features conveying extracted material onto the face conveyor as efficiently as possible. Designing a drum with a c
Jan 1, 2006
-
Coal Pillar Extraction Experiences In New South Wales
By G. H. Lind
New South Wales has a successful history of pillar extraction stretching back more than 60 years. Various methods of pillar extraction ranging from the rib pillar methods (such as the Wongawilli syst
Jan 1, 2002
-
Feasibility study of electricity generation from discard coal
By A. Engelbrecht, B. North, B. Oboirien
"There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d
Jan 1, 2015