    Three Deep Mixing Projects: Comparison between Laboratory and Field Test Results

    By George Filz, Morales, Carlos, Bertero, Filippo Maria, Alessandro, Leoni

    "The Deep Mixing Method (DMM) represents a viable solution to improve adverse geotechnical properties of foundation soils for many practical applications. A pre-construction soil investigation campaig

    Jan 1, 2015

  • DFI
    Deep Mixing Technology: Comparison between Laboratory and Field Test Result, Different Jobsite Application.

    By Alessandro Bertero, Stefano Valagussa, Filippo Maria, Wesley Schmutzler, Leoni

    "Abstract The Deep Mixing Method (DMM) represents a viable solution to improve the adverse geotechnical properties of foundation soils. Differences and the importance of performing pre-construction la

    Jan 1, 2014

  • DFI
    Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - Contents

    By Frank Rausche

    Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples

    Jan 1, 2001

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Definition of Drilling-Activity Patterns Based on Production Data Profiles

    By Diego Bellato

    Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th

    Jan 1, 2019

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)

    By Ed Revoort, Robert Schippers

    In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h

    May 1, 2022

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    The Aged Reloading Response Of Piles In Clay

    By Paul Doherty

    It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou

    Jan 1, 2011

  • DFI
    Sustainability Assessment of Deep Foundations: Case Study

    By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar

    Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions

    Jan 1, 2019

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • DFI
    Seismic Response Of Raft Foundations Supported On Aggregate Piers

    By Alper Turan

    The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedules

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Geophysical Applications For Highway Infrastructure, A Retrospective

    By William M. Dalrymple, William P. Owen, Benjamin S. Rivers

    For the California Department of Transportation (Caltrans), geophysical applications have played an important role as part of a successful multidisciplinary approach to subsurface characterization for

  • DFI
    Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)

    By Alper Turan, Hesham El Naggar

    "The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule

    Jan 1, 2017