Static And Dynamic Approaches For Bearing Capacity Evaluation Of Driven Piles In Two Dry Docks Project
By N. Shariatmadari
Two dry docks are currently under construction on the northern banks of the Persian Gulf by Iran Shipyard and Offshore Industries Co. (ISOICO). The construction of these dry docks forms a huge civil o
Jan 1, 2007
-
Innovative Use Of Micropile Load Test Data For 18th Street Expressway Bridge
By Lance A. Roberts
Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor
Jan 1, 2009
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils
By Mohammed Sakr
This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.
Jan 1, 2012
-
Underpinning A Crane Foundation
By Donald R. McMahon
This paper presents a unique case history that documents the use of a braced secant pile wall to underpin a heavily loaded footing inside of a manufacturing plant. Construction of a pit for a new man
Jan 1, 2006
-
Float-In Cofferdams
By Robert B. Bittner
Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned
Jan 1, 2013
-
Ground Water Control In The Urban Environment - Introduction
By Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? Synopsis
By A. K. C. Chan
Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460
Jan 1, 2010
-
The Spadina Pier Cofferdam - Design, Installation & Performance
By Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987
-
Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange
By Mark Maday
As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o
Jan 1, 2011
-
EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1
By EFFC/DFI Concrete Task Group
Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif
Jan 1, 2016
-
Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis
By H. Meseck
Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr
Jan 1, 2010
-
Foundations For The M25 Motorway Near To Heathrow Airport
By John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa
GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary
By Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983
By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
Quality Control For Installation Of Augered Cast-In-Place Piles
By Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997
-
The Effects Of System Components On The Deflection Of MSE Retaining Walls
By Scott C. Vollmer
This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str
Jan 1, 2003
-
Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project
By Gray Mullins
A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade
Jan 1, 2003
-
Site Management Towards Pile Execution At Qurashiya Bridge
By Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992