Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire
By J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Drilled Shaft Foundations For The KcICON Missouri River Bridge
By Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Special Foundation Systems - Introduction
By D. A. Greenwood
Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa
Jan 1, 1991
-
Pittsburgh Steelers Stadium - Deep Foundations Case Study
By Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Soil-Cement Columns For Building Foundations
By Osamu Taki
The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are
Jan 1, 1992
-
Influence Of Urbanization And Geology On Deep Foundation Design And Construction
By Hiren J. Shah
The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his
Jan 1, 2011
-
Installation And Testing Of Instrumented Tieback Anchors - Introduction
By Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone
By Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse
By Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction
By R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Suction Piles And Suction Anchors For Offshore Structures
By S. Bang
In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien
Jan 1, 2009
-
Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure
By Damian R. Siebert
Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation
Jan 1, 2011
-
Deep Foundation Shoring in South Florida
By Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
Use Of Controlled Modulus Columns In Retail & Industrial Development Projects
By Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Large Diameter Shafts - Youghiogheny Reservoir Bridge
By Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge
By Mohammad Eslami
The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway
Jan 1, 2010
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems
By Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions
By T. J. Snell
Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes
Jan 1, 2006
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis
By N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in Clay
By John S. McCartney, Ismaail Ghaaowd
This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally
Jan 1, 2018