Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
Jet Grouting As Soil Improvement In Southeast Florida
By Evelio N. Horta
The influence of soil improvement replacement area in foundation settlements is discussed for soil improvement methods used in Southeast Florida. A 3D Finite element analysis is used for two typical c
Jan 1, 2007
-
Overview Of Design Methods Of Axially Loaded Piles In Europe
By Flor De Cock
The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the findings from an Intern
Jan 1, 2002
-
A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil
By W. Tom Witherspoon
Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric
Jan 1, 2009
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary
By Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
High Risk Control For Piling And Deep Foundations - A Systematic Approach
By Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Plastoelastic Analysis Of Bearing Capacity For Soil Anchor
By Hui Yongning
This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla
Jan 1, 1991
-
CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement
By Fabrice Mathieu
The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi
Jan 1, 2006
-
Securing Rail Infrastructure in Romania
By Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2
By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
3 Recent Developments In Pile Design - Developments In Pile Design
By W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part One
By Christian Divis
[ ]
Jan 1, 2002
-
Construction Technique Used To Build The Drilled Shafts For The Victory Bridge
By T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Toward Understanding the Seismic Performance of Rigid Inclusions
By J. Tanner Blackburn, James R. Gingery, Lisheng Shao
Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.
Jan 1, 2018
-
-
Foundation Retrofitting Using Micropiles - A Case History
By Mohammad Nasim
Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a
Jan 1, 2008
-
New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)
By R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2004
-
Hand-Dug Underreamed Piles At Embankment Place, London
By W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Anchoring Tall Buildings In Lower Manhattan
By Andrew Pontecorvo
The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,
Jan 1, 2011