Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Rare Earth and Thorium Recovery in Canada

    By John R. Goode

    "The year 2011 witnessed a major surge in rare earth prices as China, supplier of +95% of the world’s rare earths, reduced export quotas and increased export taxes and duties. In response, companies a

    Jan 1, 2012

  • CIM
    Turbo Pulp Lifter (TPL™) - An Efficient Discharger to Improve SAG Mill Performance

    By Sanjeeva Latchireddi

    "Deteriorating ore grade and high demand of metals has tremendously influenced the unit capacity of SAG mills. Pebble circuits have been added to the existing SAG circuits to increase their unit capac

    Jan 1, 2007

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • CIM
    Lac Minerals Development of Hemlo

    By C. Patel, George H. Hope

    "INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an

    Jan 1, 1985

  • CIM
    In-situ mechanical characterization of a paste backfill with a self-boring pressuremeter

    By J. Ouellet

    "ABSTRACTA brief background on in-situ testing of mine backfill, as well as pressuremeter testing is briefly described, and results from an in-situ testing on paste backfill are presented. A series of

    Jan 1, 2000

  • CIM
    Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate

    By Carlos Avalos Casillas, Saul Ortiz Landeros

    The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a

    Jan 1, 2014

  • CIM
    Potential of recovering elements from produced water at oil and gas fields, British Columbia, Canada

    By S. McPhail, D. Richardson, G. J. Simandl, C. Akam, S. Paradis, M. Yakimoski, A. Teucher, Y. Cui, F. Ferri

    Historically, extracting dissolved solids from formation water was economically motivated. Today, main drivers are environmental benefits and regulations, as large volumes of water needed for hydrauli

    Jan 1, 2018

  • CIM
    Control of copper electrolyte impurities using the Eco-Tec APU®

    By C. J. Brown

    Controlling the level of impurities in copper refinery electrolytes is essential to achieving acceptable cathode purity. Purge of electrolyte is not an entirely satisfactory solution since the cost of

    Jan 1, 2005

  • CIM
    Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)

    By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves

    "The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s

    Jan 1, 2005

  • CIM
    Mining Coal Under the Sea in Nova Scotia with Notes on Comparable Undersea Coal-Mining Operations Elsewhere

    By Francis W. Gray

    Introduction Extensive undersea coal-mining has developed on both the east and west coasts of Canada, and at this time some four million tons, or 25 per cent of the total output of Canadian coal, r

    Jan 1, 1927

  • CIM
    Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall

    By H. Warren Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    May 1, 2002

  • CIM
    Metallurgical Testwork on Harmony Project Ore

    By K. Gie Tan, Frank Wright

    "Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res

    Jan 1, 2000

  • CIM
    Gouging Abrasion Resistance of Materials for Oil Sands Service

    By Rees J. Llewellyn

    Improved product development, assessment methods and evaluation studies of materials for oil sands applications have traditionally focused on low and high stress abrasion and slurry erosion resistance

    May 1, 2004

  • CIM
    Converting the Key Lake Mill Process for McArthur River Ore

    "The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri

    Jan 1, 2001

  • CIM
    Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years

    By Rick Collins

    Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM

    May 1, 2009

  • CIM
    Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi

    Jan 1, 2007

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    “Over the Hills and Far Away” Long Distance Slurry Pipelines in Mountainous Regions

    By Donald J. Hallbom

    "While pipeline hydrotransport is often the most economical way to transport large volumes of mineral concentrate, tailings, or fine ore slurry over long distances, it is in mountainous terrain that p

    Jan 1, 2006

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003