Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • CIM
    Complex Networks on a Rock Joint

    By H. O. Ghaffari

    A complex network approach on a rough fracture is developed. In this manner, some hidden metric spaces (similarity measurements) between apertures profiles are set up and a general evolutionary networ

    May 1, 2009

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    The real costs of lubrication

    By R. Melley, P. Wissner

    The paper looks at the basic theory of tri-bological wear and the role played by the lubricant and its additives. It presents the argument that the “real cost of lubrication” is not the purchase price

    Jan 1, 1997

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Gold Deposits of the Matachewan Area, Ontario

    By W. D. Sinclair

    "Between 1934 and 1956, nearly 31 million grams of gold were produced in the Matachewan area from deposits on properties belonging to Young-Davidson Mines Limited and Matachewan Consolidated Mines Lim

    Jan 1, 1982

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Treatment of complex copper concentrates in the TBRC at Boliden

    By Sune Eriksson, Stig Peterssonsune, Christer Fridfeldt

    "Boliden Metal Corporation has developed a technique to treat complex copper concentrates containing large amounts of lead, zinc, arsenic, antimony and bismuth which cannot be treated in conventional

    Jan 1, 1981

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    A Shaba-type Cu-Co(-Ni) Deposit at Luamata, West of the Kabompo Dome, Northwestern Zambia

    By Nicholas Macrae Steven

    Abstract - The Shaba-type Luamata Cu-Co(-Ni) deposit (11°50_S, 24°28_E) is located in a tectonic slice of Katangan Roan Supergroup (Mines Group) sedimentary rocks, surrounded by younger Kundelungu Sup

    Jan 1, 2000

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • CIM
    Implementation of the management safety audit system

    By Claude MacDonald, John H. Ashburn

    "IntroductionIndustrial growth and technological change over recent years had been accompanied by two major sources of concern to management and employees: (a) increase in occupational injury and illn

    Jan 1, 1987

  • CIM
    The Economics of Individually Motorized Rail Cars in Block Caving Operations

    By Scott A. Stebbins

    Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera

    Nov 1, 2011

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002

  • CIM
    Selected Physical-Chemical Aspects of Flocculation

    By F. Halverson

    "The theory of flocculation usually is in a state of flux, involves many diverse phenomena, and is complex and sometimes contradictory in details. Instead of attempting a general discourse, I shall di

    Jan 1, 1978