Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Shear Mechanism of Rock Joints under Load-Controlled Cyclic Loading Conditions

    By C. Gravel, A. Fathi, P. Rivard, G. Ballivy, Z. Moradian, M. Quirion

    Knowing shear mechanism of discontinuities under monotonic and cyclic loading conditions is a key factor in stability analysis of rock slopes and rock foundations. In this paper, the effect of cyclic

    Jan 1, 2015

  • CIM
    The Outokumpu Copper Mine, Finland, and its Discovery

    By E. L. Bruce

    Introduction The Outokumpu copper mine is situated in eastern Finland, 50 kilometers west of the city of Joensuu or 225 kilometers directly north of the city of Viborg (Viipuri), which is situated at

    Jan 1, 1931

  • CIM
    Investigation of Geomechanical Mechanisms Contributing to Valley Closure Subsidence Effects – A 3D Numerical Modelling Approach

    When underground extractions occur beneath or in close proximity to valleys and other forms of irregular surface topographic features, the observed vertical subsidence at the base of the valley is les

    Jan 1, 2015

  • CIM
    A New Electromagnetic Device for the Surveying of Subsurface Conductors

    By A. E. Lehmberg

    "IT IS KNOWN that some ores of sulphide type, such as pyrite, chalcopyrite, and bornite have an electrical conductivity comparable to that of metals, and accordingly much higher than the conductivity

    Jan 1, 1952

  • CIM
    Mining Automation Program

    By C. J. Preston, R. E. Ström, G. R. Baiden

    "On January 1st 1996 Inco Limited, Tamrock OY, Dyno Explosives Group and CANMET formed a consortium for the development of robotic mining equipment. This project is a five year research and developmen

    Jan 1, 1997

  • CIM
    Les Mines Gaspe - Smelter Operations

    By H. Langlois

    "Included in the Mines Gaspe mining complex located at Murdochville, Quebec, is a copper smelter which comprises a reverberator furnace, two Peirce-Smith converters, an anode furance, and a sulphuric

    Jan 1, 1993

  • CIM
    An Experimental Study on Fine Coal Desulfurization y Centrifugal Gravity Separation in a Dense Medium

    By Youjun Tao

    Falcon centrifugal gravity separation tests were conducted to study desulfurization and de-ashing performance with different size fractions of a high-sulfur Chinese -0.5mm fine coal in a dense medium.

    Aug 1, 2013

  • CIM
    Factors Controlling Fracture Extension

    By C. R. Fast, G. C. Howard

    The loss of fluid to the formation adjacent a fracture governs the areal extent of the fracture and the success of hydraulic fracturing as a production stimulation technique. The three flow mechanisms

    Jan 1, 1961

  • CIM
    Compressive Behaviour of Reinforced Cemented Paste Backfill

    By X. W. Yi, Z. J. Li, G. W. Ma

    In this paper, the compressive strength and failure patterns of reinforced cemented paste backfill (CPB) were studied aiming to promote the stability of backfilled stopes. The concept of ductile backf

    Jan 1, 2015

  • CIM
    Massive Sulphide Deposits In Nova Scotia

    By B. J. Keating

    "AT PRESENT, it is not certain that any of the sulphide de in the Province of Nova Scotia attain the lower grade limit of 60 per cent sulphides over the minimum area of 1,000 square feet suggested as

    Jan 1, 1960

  • CIM
    Mine Ventilation Design using a Ventilation Improvement Index

    By Dong-kil Lee

    A ventilation improvement index (VII) was developed in an effort to propose an optimal ventilation improvement measure for a designated mine. The index was designed to incorporate both ventilation eff

    Aug 1, 2013

  • CIM
    An Overview of the Paris Hills Phosphate Project, South-Eastern Idaho

    By Kenneth L. Norris

    Stonegate Agricom Ltd. is currently conducting exploration and development drilling of the Paris Hills Phosphate Project (Paris Hills Project) located in Bear Lake County, southeastern Idaho, 3.2 km w

    May 1, 2011

  • CIM
    Monodispersed Gold Nanoparticles Capped by Myristate and PPh3 Ligands Prepared by Controlled Thermolysis of [Au(C13H27COO)(PPh3)]

    By Mari Yamamoto

    Controlled thermolysis of gold(I) complex, [Au(C13H27COO)(PPh3)], at 180 °C for 5 h under an N2 atmosphere affords the new type of monodispersed spherical gold nanoparticles capped by myristate and a

    Oct 1, 2003

  • CIM
    Collaring a Shaft in Deep Overburden at Chimo Gold Mines Limited

    By J. S. Redpath

    Eighty feet of overburden, thirty feet consisting of fine, water-bearing sands, was encountered during the construction of a shaft collar for Chimo Gold Mines Limited at its Louvicourt, Quebec, proper

    Jan 1, 1966

  • CIM
    Beneficiation of Lean Iron Ores Solely by Selective Flocculation and Desliming

    By H. O. Lien

    Among the known iron deposits in Canada, many are of low grade and require beneficiation to produce an acceptable blast-furnace feed. Some of the deposits have never been considered for commercial exp

    Jan 1, 1978

  • CIM
    Undercutting at the King Mine of Asbestos Corporation, Limited

    By C. G. Harris, R. Sluyter

    The purpose of an undercut is to undermine a block of ore which will then proceed to cave into draw holes just below the undercut. Undercut-ting is the final and most vital phase in the development of

    Jan 1, 1960

  • CIM
    Study of Re-Entry Time Post Blasting at Ciguha PT Antam Ubpe Pongkor Underground Gold Mine

    By P. H. Agson Gani, T. Sitorus, N. P. Widodo

    "PT ANTAM UBPE Pongkor underground mine use blasting to develop its tunnels which will cause poisonous and dangerous gases trapped inside mine. To analyze this case, a study of mine ventilation, the d

    Jan 1, 2019

  • CIM
    Derivation of Geotechical Parameters for Cut Wall Design at Banora Point, NSW Australia

    By N. T. Oo, L. D. Hutton

    "The Banora Point Upgrade Project is a 2.5km long six-lane divided freeway in northern New South Wales, Australia. The geology at the project area comprises a volcanic succession of variably weathered

    Jan 1, 2015

  • CIM
    Field experiments of fault activation in shales

    By Y. Guglielmi, C. Gout, P. Henry, P. Dick

    The key questions about fault reactivation in shales concern the potential enhanced fluid displacement through a previously low-permeability aseismic shale formation. Here we selected a critically-str

    Jan 1, 2015

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016