Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Assessment and Selection with Indigenous People in Remote Communities

    By P Davidson

    For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig

    Jan 1, 2006

  • AUSIMM
    Capping Stations on Broken Hill South Ltd.

    In the Broken Hill South mine tile practice of issuing to the miner a quantity of fuse and a box of caps from which he made up the "rods" required for a particular blast, has been abandoned.

    Jan 1, 1932

  • AUSIMM
    Exploring the Breakage Environment in Mills with Discrete Element Methods

    Exploring the Breakage Environment in Mills with Discrete Element Methods

    Sep 13, 2010

  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
  • AUSIMM
    Oil Exploration in the Western Great Artesian Basin

    Delhi Australian Petroleum Ltd., acting as operator for the joint interests of Delhi and Santos Ltd., has been engaged in petroleum exploration in the western Great Artesian Basin since 1958.Extensive

    Jan 1, 1964

  • AUSIMM
    Recent Metallurgical Developments and their Impact on Minerals Project Execution

    This paper discusses the impacts that advances in metallurgy and process engineering have on minerals project execution. Ausenco's business is focused on integrating minerals processing technolog

    Sep 13, 2010

  • AUSIMM
    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Processing of Hard-to-Treat Copper Ore and Flotation Middlings Using Chemical Treatment

    Sep 13, 2010

  • AUSIMM
    The Application of Refrigeration in Mechanised Mines

    Australia has a long history of underground mining. Even withadvances in open cut mining equipment, techniques andeconomics, many orebodies are still best mined by undergroundmeans. In addition, moder

    Jan 1, 2001

  • AUSIMM
    The Rapid Determination of Silicon in Low-Alloy Irons

    By Belcher C. B

    A procedure was required for the rapid determination of silicon in low-alloy irons and a suitable method used the formation and reduction of silicomolybdic acid at 50°C. The procedure gives resul

    Jan 1, 1965

  • AUSIMM
    Gravity Flow Full-scale Tests at Esmeralda Mine’s Block-2, El Teniente

    By D Garcés, M Meléndez, R Castro, E Viera

    Enhancing the understanding of gravity flow in caving operations is a key factor in the design, operation and success of caving methods. Consequently, much research has been performed to increase know

    May 9, 2016

  • AUSIMM
    Coal Transport by Automatic Rope Haulages at the Brown Coal Workings of the State Electricity Commission at Yallourn, Victoria

    GENERALTHE coal deposit, where it is being worked, consists of a bed of brown coal varying in thickness from 120 ft. to 200 ft., covered by an overburden of clay, drift, loam, etc., of a thickness of

    Jan 1, 1924

  • AUSIMM
    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Microfluidic Solvent Extraction for Mineral Processing of Copper Leach Solutions

    Sep 13, 2010

  • AUSIMM
    Infra-red Absorption Study of Crocidolite and Associated Rocks from Wittenoom Gorge, W.A.

    By Patterson J. H

    An infra-red absorption study has been made of crocidolite, country rock. and associated host rocks from Wittenoom Gorge. The spectrum of the country rock is appreciably different from those of crocid

    Jan 1, 1966

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • AUSIMM
    Surface-Area Measurement of Chalcopyrite Concentrates by Methylene Blue Dye Adsorption from Aqueous Solution

    By Tyler R. J

    Methylene blue dye adsorbs on chalcopyrite concentrates slurried in aqueous solution. Saturation adsorption can be achieved within about 24 hours for dye equilibrium concentrations greater than about

    Jan 1, 1979

  • AUSIMM
    Processing Strategies for Hidden Valley Operations

    By J Watt

    The Hidden Valley Gold Project is located in a remote and mountainous area of the Morobe Province approximately 30 km south of the township of Bulolo and approximately 90 km south-southwest of the pro

    Jan 1, 2009

  • AUSIMM
    Ore Treatment at Martha Current Operations and Future Directions

    The treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t

    Jan 1, 2001

  • AUSIMM
    Palaeontology and The Mining Geologist

    In order to appreciate fully the place of palaeontology within the general framework of the geological sciences, consideration must be given to the time, about 150 years ago, just before the study of

    Jan 1, 1950

  • AUSIMM
    Bio-Oxidation of Arsenic and Stibium Bearing Gold Ores

    Bio-Oxidation of Arsenic and Stibium Bearing Gold Ores Bio-oxidation of arsenic and stibium bearing gold ores with acidithiobacillus ferrooxidans was studied. The preoxidation results show that the b

    Sep 13, 2010