Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Process Control Developments at Isa Mine Mount Isa

    By Wickham P

    Digital computer based control systems are used to implement control and monitoring over most unit operations in Mount Isa Mines Limited lead-zinc concentrator and copper concentrator. Implementati

    Jan 1, 1978

  • AUSIMM
    The Kwinana Nickel Refinery Western Corporation Limited

    Construction of Western Mining Corporation's nickel refinery at Kwinana, Western Australia, commenced in July, 1968. Production of 15,000 tons per annum of refined nickel metal will commence ea

    Jan 1, 1969

  • AUSIMM
    Gold Mineralization at the Porgera Gold Mine, Papua New Guinea, in Response to Fluid Mixing

    By Heinrich CA, Wall VJ, Walshe JL

    The Porgera Gold Mine, located in the highlands of Papua New Guinea, has produced over 5 million ounces of Au, since its opening in late 1990. The deposit is located within Upper Cretaceous Papuan Pl

    Jan 1, 1995

  • AUSIMM
    Flotation Rate Constant Prediction for Metal Sulfide Particles

    By S R. Grano, J Duan, T A, D Fornasiero

    We have determined the experimental rate constants for chalcopyrite particles floated from a complex sulfide ore and compared them with those calculated using a recently developed flotation model. The

    Jan 1, 2005

  • AUSIMM
    Aerial Infra-Red Photography as a Guide to Geological Conditions

    The use of black and white and colour infrared film in remote sensing of natural resources, is reviewed. In heavily-forested areas such as New Zealand, the main value of the method is in surveying

    Jan 1, 1971

  • AUSIMM
    Coal into the 21st Century

    By Tomlinson R. C

    The paper will briefly describe planning in the National Coal Board (NCB) and the contribution that operational research makes to it. It will then give details of some of the models in use and will

    Jan 1, 1977

  • AUSIMM
    The Effect Of Prices And Cost On Ore Reserves

    Changes in prices and costs change the mineable grade and the profitabil- ity of an ore reserve. In a static world the grade required for an ore reserve is measured by the ratio: Cost/tonne of ore x

    Jan 1, 1979

  • AUSIMM
    An Expert Neural Network to Control a Mineral Flotation Process

    By Durao F

    A multi-layer feed-forward neural network was trained (using the error back-propagation algorithm) to learn a subset of rules designed to stabilise the performances of the copper flotation section o

    Jan 1, 1995

  • AUSIMM
    An Evaluation of Blast Performance at the Kidston Gold Mine

    By Paine G

    Kidston Gold Mines commenced mining in 1984 and currently mine approximately 10 million tonnes per annum of ore and waste using a conventional truck and shovel open pit method. The overall mine grade

    Jan 1, 1986

  • AUSIMM
    The Influence of the Quality of Ferrosilicon on the Rheology of Dense Medium and the Ability to Reach Higher Densities

    The beneficiation of heavy metal oxides, such as iron ore, is usually performed with heavy medium separation in cyclones, static baths and lately with Larcodems. Atomized ferrosilicon is most suitable

    Jan 1, 2002

  • AUSIMM
    Comparative Cyanide and Thiourea Column Leach Studies on a Central Victorian Gold Ore

    This work describes preliminary laboratory testwork to study the relative leaching response to cyanidation and thiourea leaching of an oxidised low grade gold ore. The potential of an alternative li

    Jan 1, 1994

  • AUSIMM
    Coal Combustion Technology-Status and Future Developments

    The use of coal as a fuel for heat and power generation has a long history. During the nineteenth century most of the present combus- tion technologies were pioneered, as shown in Table 1, This per

    Jan 1, 1987

  • AUSIMM
    Visual Aspects of the Landscape

    To carry out its responsibilities the SECV needs to manage the visual environment effectively. Every land oriented decision effects what we see and the value in pursuing visual excellence is supported

    Jan 1, 1992

  • AUSIMM
    Underground Mine Ventilation Planning and Design With Regards to Heat Load and Cooling Mechanisms

    By H R. Phillips

    The ventilation and refrigeration design of underground mines is an important aspect, when new or existing mines are considered and places a great responsibility on engineers tasked to do so. The curr

    Jan 1, 2005

  • AUSIMM
    Dynamic Simulators for Training Personnel in the Control of Grinding/Flotation System

    By Herbst JA

    During the last decade, it has been established that conventional mineral-processing control strategies based on classical control theory result in significant increases in plant throughput and operat

    Jan 1, 1985

  • AUSIMM
    Mining Joint Ventures - Major vs Minor

    When a joint venture is established between a major and a minor, the co-venturers often have a number of divergent interests; the major may have put up significantly more capital into the project a

    Jan 1, 1997

  • AUSIMM
    Preliminary Investigations into a Roll Crusher With Non-Cylindrical Rolls

    By D M. Weedon

    This paper introduces a novel roll crusher design, which incorporates non-cylindrical crushing rolls. The use of non-cylindrical rolls enables the crusher to achieve a greater reduction ratio than is

    Jan 1, 2000

  • AUSIMM
    Mining Smart Instrumentation on Future Intelligent Mines

    By R Farana

    The future challenges in mining instrumentation, mainly on future intelligent mines, are to continue providing instruments with the highest level of reliability at the lowest possible cost, and also t

    Jan 1, 2003

  • AUSIMM
    Platinum-Group-Metal Occurrence in New Zealand

    Platinum Group metals have been known in New Zealand since the 1880's but not produced on a large scale. They have been neglected because their value was not appreciated rela- tive to gold and

    Jan 1, 1987

  • AUSIMM
    Notes on Copper Smelting at Mount Isa During 1943-1946

    In the years prior to the outbreak of war in 1939 Australia's production of copper had declined from a peak of about 80,000 tons in 1911-1915 to approximately 25,000 tons in 1939. This production

    Jan 1, 1953