The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine Australia
This paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fil
Jan 1, 1973
-
Major Wear Parts in a Continous Copper Rod Plant and their Effect on Operations
By Murphy MW, Klaric SD
The history, operation and design of the Secor continuous rod production process is described. The effective operation of the plant is influenced by accurate monitoring and control of molten metal pro
Jan 1, 1985
-
Fragmentation Prediction in Bench Blasting
By Wang S
Fragmentation is the basic concern in rock blasting and serves as the main measure of blasting effectiveness. A good estimation of fragment size distribution before blasting is very useful and helpf
Jan 1, 1990
-
Planning and Developing a New Mine in the Old Stawell Goldfield
The history of potential large scale development at Stawell in northwestern Victoria dates back to 1914, when Great Boulder Mines Limited, of Kalgoorlie, Western Australia, took up options on some of
Jan 1, 1984
-
Development of the ANI Bradken Vortex Pulp Lifter and the Spherical Head Bolt Mill Liner Fastener System
By Royston, Woods R
ANI Bradken Vortex Pulp Lifters and Grates, both as original equipment and retrofitted to existing SAG mills, are now in field operation. The development of the Vortex leading curve pulp lifter was
Jan 1, 1997
-
Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore
The process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The exis
Jan 1, 1989
-
Application of Linear Shaped Charges for Pre-Splitting
By Sen G
An amount of explosives, whether it be cylindrical, spherical, etc in configuration, with a hollow cavity in one face or end is known as a hollow or shaped charge. When this charge is initiated, a f
Jan 1, 1995
-
Electrification and use of Electric Hydraulic Equipment at Mount Lyell
In 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos
Jan 1, 1985
-
Blasting at Shallow Depths: Problems and Improvements
Rock formation at shallow depths is generally associated with complex geology consisting of many joints, fractures, bedding planes, etc. Fragmentation results from primary blasts in such strata are
Jan 1, 1995
-
Museum Station Conceptual Planning and Preliminary Works
By Terry G. A B
Before detailed design of Museum Station could commence, a number of factors had to be considered to determine its exact location within the city street pattern, the depth and the dimensions of th
Jan 1, 1981
-
Modelling the Basic Separation Phenomena in Flowing Film Concentration Processes
By Bevilacqua P, Preti U
The basic separation phenomena taking place in film concentration processes are studied through a kinetic-probabilistic approach. This approach is based on the fact that the particle velocity in the
Jan 1, 1993
-
Dry Screening of Iron Ore at the Operations of Hamersley Iron Pty Limited
By Artone E
screening equipment installed in e Hamersley Iron operation is described, and tails of operating parameters and screening - Iia in use are given. Tests were carried out on full-size reens in the op
Jan 1, 1984
-
Blasting - An Exciting Non-Boring Alternative
By Hyde L. J
Blasting is one of the available technologies to be employed in underground excavation systems. In many instances it can be the only technology which is suitable. The recent moves towards more me
Jan 1, 1987
-
Sublevel Cave Propagation at Mount Marion Gold Mine
By P Hucker, E Hall
Harmony Gold operates the Mount Marion underground gold mine near Kalgoorlie, Western Australia. The mine consists of two ore zones, East and West, and mining of these zones is currently conducted usi
Jan 1, 2007
-
Production Ripping as a Viable Alternative to Blasting
Material hardness and environmental factors can limit or restrict conventional blasting techniques and this has led to advancements in the performance and efficiency of ripping. Not all materials ca
Jan 1, 1995
-
Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit.
By Zhao JC, Chen JJJ
A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a g
Jan 1, 1995
-
How to Make (and Lose) Money in Minerals Exploration and Development in a Changing Environment
Viking Holdings Ltd, a Todd Corporation company, is active in the mineral industry through operations, joint ventures and equity investments. Identification and management of risk is key to the succes
Jan 1, 1997
-
Aspects of the Developments and use of a Minicomputer-Based Coal Mine Planning System
By Snowdowne J. B H
Rand Mines, Limited, located in Johannesburg, Republic of South Africa has recently completed feasibility studies which have lead to the initiation of two major coal strip mining ventures. A minico
Jan 1, 1977
-
Prediction of Rock Cutting Performance using Fracture Mechanics Principles - A review
By Waller M. D, Whittaker B. N, Singh R. N
This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process
Jan 1, 1992
-
Longhole Pillar Mining at Pasminco Broken Hill Mine with Particular Reference to Driving through Sandfill
By P Ormsby, T Hewitt
Ore in pillars constitutes a significant proportion of the ore reserve at PasmincoÆs Broken Hill Mine. Many of these pillars are narrow (5 -6 m) and high (16 û 35 m) vertical blocks. High-grade ore ha
Jan 1, 1998