Effectively Installing and Commissioning Flotation Equipment
By B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
Evolution of In-Seam Drilling for Gas Drainage
By F Hungerford
"In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice
Jun 1, 2012
-
Water Issues in DOZ Block Cave Mine, PT Freeport Indonesia
By E Widijanto, A Srikant
PT Freeport Indonesia operates a copper-gold mine located in the remote highlands of Papua, Indonesia, about 3500 km east of Jakarta. Currently, the district produces about 240 000 tonnes per day (tpd
Jan 1, 2006
-
Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment
By A Keogh, P Allen, P Stoker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an
Mar 18, 2015
-
What Happens If?-Some Remarks on Useful Geostatistical Concepts in the Design of Sampling Patterns
Answers to many questions arising in the different phases of exploration, estimation and production of a mineral deposit, can be found in the geostatistical theory of G. Matheron. It is shown that
Jan 1, 1976
-
Raisebore drill string recovery case study
By M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Application of Mineral Processing in Waste Treatment and Scrap Recycling
Proceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.
Jan 1, 1993
-
Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated Landforms
By T Leidich, M Van Zyl, H Lacy
Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof
Jul 16, 2014
-
Carrapateena project to date – Geotechnical risks and management
By G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
The Practical Design of a Hydraulic Hoist
The intention of this work was to con struct a machine on a pilot scale which could hoist a mixture of ore and water through a height of 300 metres and to operate the mach- ine to determine the para
Jan 1, 1973
-
The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and Crushing
By J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo
Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in
Aug 24, 2015
-
Prediction of Strata Caving Characteristics and its Impact on Longwall Operation
By Nemick JA
Recent advances in computer simulation together with field measurements of caving and microseismic activity about longwall panels, has allowed a much better understanding of the caving process and the
Jan 1, 1998
-
A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors
By R M. Krek
The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy
Mar 24, 2014
-
Blast Furnace Aerodynamics
By Petersen V, Potke W, Polthier K
The paper reviews some of the aerodynamic factors in the blast furnace process and outlines the areas requiring further study. Detailed discussion is given to the pressure drop in both the dry and th
Jan 1, 1975
-
Mine Development Optimisation – An Evolutionary Process
By J Kovacs
Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ
Mar 24, 2014
-
Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planning
By M Ozkayhan, N Arslan
"The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele
Sep 20, 2017
-
In-Pit Crushing and Conveying Bench Operations
By T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia
By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana
The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f
Aug 18, 2014
-
Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington
The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the
Jan 1, 2002
-
Application of Artificial Neural Network in Estimation of Hydrocyclone Parameters
By Gupta A, Fung C. C
The hydrocyclone parameter d5Oc is estimated by the application of Artificial Neural Network (ANN). Results indicate that ANN performs equally well as compared to statically derived analytical formu
Jan 1, 1996