Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Aspects of Model Building in Flotation Circuits

    Process variables in flotation circuits are outlined with a view to producing mathematical models of circuits. The nature of the kinetics of flotation are discussed and the effect of process variabl

    Jan 1, 1971

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Evaluation of Pyrrhotite from Selected Ni and Platinum Group Element (PGE) Ore Deposits and the Influence of its Mineralogy on Flotation Performance

    By D Bradshaw, J R. R de Villiers

    The non-stoichiometric sulfide mineral pyrrhotite (Fe(1-x)S), common to many nickel and platinum group element (PGE) ore deposits, occurs in varying crystallographic forms with the different types exh

    Jan 1, 2008

  • AUSIMM
    Microbial Aspects of Environmentally Benign Iron Ore

    Many types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of

    Jan 1, 2009

  • AUSIMM
    Deployment of Self - Contained Self Rescuers in Coal Mines

    By Baafi EY, Sun Y, Tague I

    Field trials at three New South Wales and one Queensland coal mines were carried out to gather data on oxygen "run out" times of Self-Contained Self Rescuers (SCSRs), time taken to escape from the min

    Jan 1, 1998

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • AUSIMM
    Ore-Dressing Mineralogy in Flowsheet Development and Improvement

    By Stevenson BG

    The relevance of ore-dressing mineralogical investigations to developing and improving metallurgical flow-sheets is discussed and examples are given of the application of such studies to various t

    Jan 1, 1978

  • AUSIMM
    Project Financing in a Challenging Environment-Offshore Norway

    Offshore petroleum development involves massive capital expenditure and financing demands, with the main participants being large international oil companies and State owned enterprises. Types of

    Jan 1, 1983

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Ceramic Vacuum Filters - The Australian Experience

    This paper outlines the advances made in vacuum filtration as developed by Outomec Process Filters and details the results obtained at a number of Australian installations. The first section of the

    Jan 1, 1991

  • AUSIMM
    Three-dimensional Mapping of Magnetite and Hematite Concentrations from Reprocessing of Detailed Aeromagnetic Data

    By C A. Foss, D A. Clark, D Hillan

    While magnetic surveys are the most common geophysical method used in mineral exploration, magnetics and geology remain to be fully integrated quantitatively in iron ore provinces. Although high-resol

    Jul 13, 2015

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022

  • AUSIMM
    Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form

    By D J. A Van Zyl, J C. Cunning

    Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the

    Jan 1, 1998

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    Some Considerations in the Mining of Saddies, Spurs and Backs on the Bendigo Goldfield

    Any future developer of underground mining on the Bendigo goldfield will need to understand the unique geology and gold occurrence of this field. The development and sloping system employed will be pr

    Jan 1, 1993

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AUSIMM
    The Electronic Delay Detonator Trial at KCGM Mount Charlotte Operation

    By D Caffrey

    To demonstrate the advantages of using electronic delay detonators over pyrotechnic detonators, a trial using the DNES Dynatronic System was conducted at the KCGM Mount Charlotte operation in 1998. Th

    Jan 1, 1999

  • AUSIMM
    Performance of the IsaMills in the George Fisher Flowsheet

    By M Gao

    Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation

    Jan 1, 2000

  • AUSIMM
    A Study on the Impact of Utilising Sea Water for Wet Concentration of Beach Minerals Deposits on the Recovery and Quality of Ilmenite Produced by High Tension Separation

    By C Swamydas

    VV Mineral (VVM) group of companies is the largest and the first private producer and exporter of beach sand mineral products in India. During 2010, the company produced and marketed around 750 000 to

    Oct 5, 2011

  • AUSIMM
    Decoupling the pulp and froth effect of ultrafine particles on Itabirite iron ore flotation

    By B McFadzean, N P. Lima, D A. Deglon

    The reverse flotation of Itabirite iron ore is typically performed after a desliming step in which most of the sub-10 µm particles are removed. This is done to limit processing problems such as poor f

    Aug 24, 2022