Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011

  • AUSIMM
    Mine Water - Optimising for Site and Environment

    By P Thompson, B W. Atkinson

    Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati

    Nov 26, 2013

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide Solution

    By S Lakemond, L I. Ku, J Vaughan

    Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co

    Sep 26, 2013

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Listing on Australian Stock Exchange

    Listing on Australian Stock Exchange Limited ('ASX') is a means by which a company can prosper and grow by gaining access to a large capital market. This currently stands at over $300 bil

    Jan 1, 1996

  • AUSIMM
    Coal as a Source Rock for Hydrocarbon Gas in the Aldebaran Sandstone, Denison Trough, Bowen Basin - Geochemical Evidence

    By Golding S. D, Price P. L

    The Early Permian Aldebaran Sandstone is the main hydrocarbon reservoir in the Denison Trough. Contained hydrocarbon gas has a wet gas index (C1/CI - C4) of between 0.87 and 0.97 (N=10), and consti

    Jan 1, 1991

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Lady Loretta - A New Approach to an Old Opportunity

    By C R. Fountain, W R. Cannings

    The zinc-lead-silver mineral resource at Lady Loretta ranks amongst the worldÆs richest when measured in terms of in situ metal grades. However, the project remains undeveloped 28 years after its disc

    Jan 1, 1998

  • AUSIMM
    Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming

    By M Aros, L Reilly

    Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal

    Nov 24, 2014

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    Multi-Stage Stochastic Optimisation for Managing Major Production Incident

    By R Razanatsimba, A Galli

    A mining company has entered into contractual commitments to supply certain quantities of its product to clients in each time period. Failure to fulfil its obligations would damage its reputation as a

    Sep 26, 2011

  • AUSIMM
    The Autoxidation of the Thiolate Collectors Catalysed by Cobalt (II) Phthalocyanines and its Influence on the Sulphide Flotation

    By Faidel VV, Yushina TI, Yagodkina NG, Yatsimirsky AK, Chanturiya VA

    Among the problems of the flotation of sulphides by the thiol collectors is the dependence and varieties of the flotation starting with the time and oxygen contents in the slurry. For sulphides, the

    Jan 1, 1993

  • AUSIMM
    The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams

    By J L. Kerr, J Beyer-Robson, S Vink

    Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall

    Nov 26, 2013

  • AUSIMM
    Managing Geological Intellectual Property and Competitive Advantage - Newcrest Mining LimitedÆs Experience

    By M Berry, F MacCorquodale

    The ownership, management and employment structures operating in the Australian minerals industry have dynamically evolved during the last 30 years. One of the most dramatic changes, from an explorati

    Sep 26, 2013

  • AUSIMM
    Keynote Address The Human Element in Apcom's Development

    It is indeed a privilege and honour to deliver the keynote address at this 15th APCOM symposium. APCOM has played a significant role in my own career and I am sure in the careers of many of the th

    Jan 1, 1977

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011