Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    Furnace Upgrade With Hatch Technology At Pt Antam FeNi-II IN Pomalaa, Indonesia

    By I. Jauhari, F. Stober, D. Fowler, B. O. Wasmund, T. Miraza, C. Nichols, A. Taofik Hidyat, K. Said

    The existing PT Aneka Tambang (Antam) ferronickel smelter located at Pomalaa, Indonesia consists of two RKEF lines with reduction furnaces nominally rated at 17 MW and 18 MW, respectively. The low pow

    Jan 1, 2007

  • CIM
    Effect of Oil Sand Mining Operations on Haul Truck Dump Body Design

    By David Whalen

    Mobile equipment in oil sand mining operations experience more maintenance problems than similar equipment in other surface mines, due to soft underfoot conditions. Oil sand properties are known to va

    May 1, 2003

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • AIME
    Further Discussion on Pressure Drawdown and Buildup in the Presence of Radial Discontinuities

    By H. K. VAN POOLLEEN, W. Hurst, H. C. Bixel

    In an earlier publication* I showed the development of the instantaneous point source solution for a well producing at a constant rate at the center of a system of two radial, adjoining sands of diffe

    Jan 1, 1969

  • SME
    Review Of EPA Mandatory Reporting Of Greenhouse Gases (GHG) Rule Or ?MRR? ? Introduction

    By S. M. Carpenter

    In response to the FY2008 Consolidated Appropriations Act (H.R. 2764; Public Law 110?161), the United States Environmental Protection Agency (USEPA) issued the final Mandatory Reporting of Greenhouse

    Jan 1, 2011

  • AUSIMM
    Removal of Thiocyanate from Solutions by Precipitation

    Removal of Thiocyanate from Solutions by Precipitation

    Sep 13, 2010

  • SME
    Emplacement And Mineralization Of The San Cristobal Ag-Zn-Pb Deposit, Southern Bolivia

    By S. E. Phillipson

    The Late Miocene San Cristobal Ag-Zn-Pb deposit represents syngenetic and epigenetic mineralization with low- and high-sulfidation characteristics. Geology is characterized by barren dacitic ring fra

    Jan 1, 2001

  • SAIMM
    Utilization of scripting languages for customization of mine planning packages by specialized users

    By D. R. Hack

    The complexity of commercial mining software has gained rapidly over the past decade as hardware developments have surpassed software capabilities at a staggering rate. Software users, recognizing the

    Jan 1, 2003

  • SME
    CFD Analysis Of Two-Phase Flow In A Self Aerated Flotation Machine

    By H. Fayed

    Two-phase (water and air) flow in a self aerated WEMCO flotation machine has been investigated using computational fluid dynamics (CFD). A 0.8 m3 model is considered. The flow is modeled by Euler-Eule

    Jan 1, 2012

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • AUSIMM
    Land Rehabilitation at Golden Cross, Eight Years After Mine Closure

    By D Crequer

    Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents

    Jan 1, 2006

  • IIMP
    Gerenciamiento integrado de informaciones geológicas

    By Frederic Vanderoost

    Actualmente, el manejo adecuado de las informaciones geológicas en el sector minero optimiza recursos y maximiza resultados. En ese sentido, el presente texto señala la implantación de un conjunto de

    Aug 25, 2002

  • SME
    Investigation And Modeling Of Longwall Face-To-Face Transfers

    By E. Topuz, C. Patrick

    Longwall face-to-face transfers can cost more than $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high costs make extensive planning and control of the tran

    Jan 1, 1994

  • AUSIMM
    Re-Opening the Bullendale Mine

    Aurum Reef Resources is a provincially owned unlisted public company which holds a number of prospecting licences over Otago hard rock historically active minesites. The Bullendale Licence 31 1845 was

    Jan 1, 1992

  • SAIMM
    Towards best practice for routine seismic hazard assessment in mines

    By G. van Aswegen

    Seismic monitoring became commonplace in the deep South African gold mines in the early 1990’s. The discipline has, to a large extent, developed beyond the ‘research’ stage, and a ‘Guide to Seismic Mo

    Jan 1, 2003

  • SME
    Northern Dynasty Mines’ Pebble Project: A Strategic Resource For Alaska

    By Stephen Hodgson, Ken Brouwer

    September 2005, Northern Dynasty Mines announced the discovery of a new, high-grade deposit at its Pebble project in southwest Alaska. The product of insightful geological investigation, Pebble East,

    Jan 1, 2007

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • SME
    Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling

    By K. Awuah-Offei

    Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The

    Jan 1, 2012

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003