Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Linear Behavior Of Rock Joints In Uniaxial Joint Compression TestsBy D. Nutakor
Rock joint stiffness is not only a poorly known parameter, but also has no established laboratory measurement procedure. This paper presents methods used to determine the normal and shear stiffnesses
Jan 1, 2008
-
Continuous Mining Machine Conveyor System Sound Power LevelsBy Adam K. Smith
Occupational hearing loss is a permanent illness with no recovery currently possible. For underground coal mine workers, Noise Induced Hearing Loss (NIHL) continues to be a serious health issue. One
Jan 1, 2008
-
Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil MovementsBy L. F. Miao
Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular
Jan 1, 2008
-
Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Evaluation Of Dust Exposures Associated With Mist Drilling Technology For Roof BoltersBy T. W. Beck
Overexposure to respirable dust remains a widespread health hazard to roof bolter occupations in underground coal mines. Recently implemented mist drilling technology was evaluated for its effectivene
Jan 1, 2008
-
A New Diatomite Resource In EgyptBy M. I. Al-Wakeel
Nile sediment was collected as a waste from one of the water treatment plants in Cairo, and subjected to petrographical investigation and granulometric, chemical, and mineralogical analyses. It was ex
Jan 1, 2008
-
Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)By Jürg Schlumpf
Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off
Jan 1, 2008
-
Earth Pressure Balance Tunneling In CanadaBy Laura McNally
In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer
Jan 1, 2008
-
Improvements in the InLine Pressure Jig Expands its Applications and Ease of Use for Gold, Silver, Sulfide and Diamond RecoveryBy T Hughes
The Gekko InLine Pressure Jig (IPJ) was unleashed on the World gravity separation market in 1996 and has since sold over 150 units in applications including tin, diamonds, silver, coal, garnet and gol
Jan 1, 2008
-
Support system performance under different corrosion conditions - SynopsisThis paper reports on recent field observations on the performance of support systems under different corrosion environments in Canadian underground mines. Phenomenological data are used to gain a bet
Jan 1, 2008
-
Analyzing factors influencing struck-by accidents of a moving mining machine by using motion capture and DHM simulationsBy John R. Bartels
Remote operation of continuous mining machines has enhanced the health and safety of underground miners in many respects; however, numerous fatal and non-fatal continuous miner struck-by accidents hav
Jan 1, 2008
-
Correlation of Sonic Travel Time to the Uniaxial Compressive Strength of U.S. Coal Measure RocksBy David Oyler
Sonic travel time logging of exploration boreholes is routinely used in Australia to obtain estimates of coal mine roof rock strength. Because sonic velocity logs are relatively inexpensive and easy
Jan 1, 2008
-
A zero-one integer programming model for open pit mining sequences - SynopsisBy J. Gholamnejad
The aim of short-term production scheduling is to decide which blocks of ore and waste to mine in which time period (shift, days, weeks or months) so that several operational and geometrical constrain
Jan 1, 2008
-
Is The Mining Industry Ready To Go Green?By Michele Ashby
The mining industry is facing new risks from peak commodities, the energy and economic crisis and stock market pressures. The Green Mining Industry Initiative is a risk management strategy for the fut
Jan 1, 2008
-
Rehabilitation of the 80-Year-Old North Outfall Sewer (NOS) TunnelBy Wolfgang Roth
In 1990, a residential area above the North Outfall Sewer (NOS) tunnel constructed in 1924, experienced subsidence. After sewage was diverted into the North Outfall Replacement Sewer (NORS), soil prob
Jan 1, 2008
-
Ceramic Tile Wastes As Alternative Raw Materials for the Production of Portland Cement ClinkerBy A. Barba, M. P. Gómez, F. Puertas, M. Palacios, M. F. Gazulla, S. Martínez-Ramírez, I. García-Díaz
"The present study explores the reactivity and burnability of cement raw mixes containing fired red or white ceramic tile wastes or combinations of the two as alternative raw materials. The results sh
Jan 1, 2008
-
Model For The Fragmentation Of Copper Matte Particles During Flash ConvertingBy M. Pérez-Tello
A mathematical model to represent the expansion and fragmentation of copper matte particles oxidized under flash converting conditions is presented. The model assumes that the particles are initially
Jan 1, 2008
-
Blast fragmentation optimization at Tarkwa Gold Mine using 6 Sigma methodologiesBy A. Amiel
Tarkwa Gold Mine is owned by Gold Fields Ghana, IAMGOLD and the Government of the Republic of Ghana in a 71%, 19% and 10% ratio. The mine is operated by Gold Fields Ghana. This large, low-grade, open
Jan 1, 2008
-
Rock Mass Classification is Only Part of the Answer to Assess Raise BoringBy J Wallis
The stability of a raise bore is often assessed using the rock mass classification system published by McCracken and Stacey as a modification of the Q system. Often the assessment is done using a spre
Jan 1, 2008
-
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic ShakingBy Bhaskar B. Thapa
The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet
Jan 1, 2008