Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Teamwork, Technology Key in Rescuing Coal Miners

    By Steve Kral

    The dramatic rescue of nine Pennsylvania coal miners trapped nearly 90 m (300 ft) underground for77 hours probably would not have happened without the high technology equipment and improved mine rescu

    Jan 1, 2002

  • SME
    Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME
    Promoting Cooperation Between Small- and Large-Scale Miners in Ghana

    By C. Anim-Sackey, R. K. Amankwah

    Some large-scale mining companies in Ghana have adopted proactive management strategies in dealing with small-scale (galamsey) miners who have encroached on their concessions. This has been mainly ac

    Jan 1, 2004

  • SME
    Quantifying Relationships Between Subsidence and Longwall Face Advance Using DInSAR

    Surface subsidence that results from longwall mining can be large magnitude and can affect significant areas. Conventional methods for subsidence monitoring include leveling, global positioning system

    Jan 7, 2020

  • SME
    Reverse Column Flotation Of Iron Ore

    By T. C. Eisele

    The use of column flotation was considered for the ?reverse flotation? of iron ore, where the gangue (quartz) was recovered in the froth product. This use of the froth for carrying the gangue mineral

    Jan 1, 2007

  • SME
    Development Of An Automated Drill And Blast System

    By Dennis P. Martin, Michael M. Fitz, James E. Friant

    Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only

    Jan 1, 1989

  • SME
    Preventing Roof Falls in Weak Ground

    By Ryan C. Stephan, Christopher Mark

    "Some of the weakest roof in United States coal mines is found in the Illinois Basin. Historically, the Illinois Basin has also suffered from high rates of unplanned roof falls and rock fall injuries.

    Jan 1, 2019

  • SME
    CFD Modeling Of Air Flow In An Open Pit Mine

    By W. Collingwood

    As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i

    Jan 1, 2011

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • SME
    Technology News - More P&H Shovels Operate in Canadian Oil Sands

    P&H MinePro Services Canada is supplying Syncrude Canada three more of its model4100BOSS electric mining shovels. The shovels will be delivered during 2003. Syncrude’s oil sands operations already u

    Jan 1, 2003

  • SME
    Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

    By Christophe Bragard

    The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project

    Jan 1, 2008

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration (5cd6bb51-d24c-4ceb-bdd2-327b1ac6637a)

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • SME
    Roadheader Tunneling and Microtunneling in Low Strength Claystone at Standley Lake, Colorado

    By Glen Church, Don W. Deere, Christoph M. Goss

    The Standley Lake Dam Rehabilitation Project in Colorado included the complete replacement of the outlet works. This required two 1.8m (6 ft) diameter microtunneled wet lake taps, 380m and 186m (1246

    Jan 1, 2005

  • SME
    Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling

    By Siegmund Babendererde, Jan O. Babendererde

    Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct

    Jan 1, 2001

  • SME
    Thermodynamic Constraints On Arsenic And Heavy Metals Removal From Water With Limestone-Based Material

    By A. D. Davis

    Limestone-based material is effective for reducing arsenic concentrations below the current limit of 10 parts per billion for drinking water, typically resulting in final concentrations of about 4 to

    Feb 27, 2013

  • SME
    Advanced Surface Enhancement Technology For Decreasing Wear And Corrosion Of Equipment Used For Mineral Processing

    By Chaoxun Zhao, Daniel Tao, Craig Blue, Narendra B. Dahotre, Rick Honaker, Bhupendra K. Parekh, Hongyang Han

    Equipment wear and corrosion have significant adverse impacts on the operating cost and efficiency of mineral processing plants. In this project advanced surface enhancement technologies are being in

    Jan 1, 2005

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007