Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Are Ferronickel Furnaces at Thermodynamic Equilibrium?By M. Y. Solar, W. G. Davenport
Most of the recent growth in nickel demand has been for the production of stainless steels and virtually all of it has been satisfied by new ferronickel and nickel pig iron projects. But "good" lateri
Jan 1, 2014
-
Process Development for Milling B-Zone Ore at Rabbit LakeBy S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Forage ITH à Haute Pression à la Mine GoldexBy Patrick Frenette
Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s
Feb 1, 2008
-
Comparision of Two Sizes of FSFs in the Glogów Copper SmelterBy L. Garycki, P. Poks, R. Urbaniak, T. Gabka
In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac
Jan 1, 2019
-
Evaluation of the Performance of a CIP Gold Recovery ProcessBy M. Courchesne, C. Barbery, D. Hodouin, C. Carrier
"The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat
Jan 1, 1987
-
The Relations between Assarel-Medet JSC, Bulgaria, and the Municipality ?f Panagyurishte - A successful model for sustainable and socially responsible partnershipBy Lachezar Tsotsorkov
Corporate social responsibility Is a principal trend of the corporate strategy for sustainable development of Assarel-Medet JSC ? the largest Bulgarian company for open pit mining and ore processing
Aug 1, 2013
-
Innovations in Gold and Silver Recovery: World OverviewBy Hans von Michaelis
"INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i
Jan 1, 1985
-
The Union Bay Platinum Prospect, SE Alaska, a Hydrothermal PGE DepositBy C. J. Van Treeck
PGE concentrations of 18 g/t occur in the pyroxene rich rocks at the Union Bay Alaskantype complex. This PGE enrichment is hosted in magnetite veins. These veins cross magmatic layering and have an ir
May 1, 2003
-
FLAC Simulation of Split-Pipe Tests on an Instrumented Cable BoltBy Marc Ruest
A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are availa
May 1, 2002
-
Declarations and Access ControlThe common theme of these four objectives is declaration. Declaration tells the compiler that an entity exists and also provides the name and nature of the entity. Since everything you create has to b
May 1, 2011
-
Effect of Grinding Operation on Product Morphology in Stirred MillsBy Bern Klein, Randy Blaskovich, Reem Roufail
"Morphology is a tool that is rarely used for mineral breakage mechanism evaluation. Ground particles are typically assessed for their size distribution. They are also visually analyzed using image an
Jan 1, 2011
-
Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air PurificationBy Hiroaki Sakurai
Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p
Oct 1, 2003
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
Maximising Concentrate Revenues at the Xstrata Copper Kidd ConcentratorBy G. R. Morin, A. R. Leggett
"In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous
Jan 1, 2013
-
Developing Solutions to Complex Flotation ProblemsBy B. K. Gorain
"Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed
Jan 1, 2013
-
Study of slime coatings in flotation by electrophoretic mobility distribution measurementBy Jacob Masliyah, Zhiang Zhou, Tshitende Kasongo, Jianjun Liu, Zhenghe Xu, Jeawon Choung
"Slime coating is a recognized challenge in fine particle flotation, not only in decreasing recovery, but also in reducing the selectivity and hence froth quality. In this presentation, a novel method
Jan 1, 2002
-
SPOC Project Software and ManualBy R. F. Pilgrim
"This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a
Jan 1, 1986
-
Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.By Bruno Lemelin
Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther
May 1, 2004
-
The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1By Marc Legault
The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra
May 1, 2004
-
Comminution Circuit Comparison Conventional versus Semi-AutogenousBy G. H. Babcock, D. A. Knight, V. G. Medina
"Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group
Jan 1, 1991