Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
Model And Experimental Study Of The Effect Of Impeller Rotational Speed On The Flotation Rate From A Small-Scale Flotation Cell - Implications For The Effect Of Bubble VelocityA series of flotation experiments were carried out in a 2.25-dm3 laboratory-scale Rushton turbine cell using hydrophobic quartz particles. Flotation was performed at a constant mean bubble diameter ov
Jan 1, 2007
-
Behavior of Battered Piles under Lateral Loads in Sandy SoilsBy Jogeshwar P. Singh, Ahmed AlaaEldin, Mohamed Ashour
The presented methodology allows the determination of the response of laterally loaded battered long piles in sandy soils based on the soil-pile interaction. The Strain Wedge (SW) model which was orig
Jan 1, 2018
-
Influence of Highly Permeable Geologic Structure on Inflows to A154 N/S Open Pit Diavik Diamond Mines Inc., Lac de Gras, NWTBy Jeff R. Reinson
The Diavik Diamond Mine is producing diamonds from two orebodies, the A154 South and A154 North kimberlite pipes, discovered beneath the waters of Lac de Gras. Innovative dike technology with appropri
May 1, 2006
-
The Pogo project: flowsheet development and designBy Eric Konigsmann
"The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un
Jan 1, 2002
-
Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova ScotiaBy Erwin L. Zodrow
"The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,
Jan 1, 1982
-
New online/atline splitter designs for laboratory automation – feasibility resultsBy A Hollweg, K H. Esbensen, M Lischka
Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation
May 9, 2017
-
Bioleaching Metals from Waste Printed Circuit Boards and the Shapes of MicroorganismsBioleaching Metals from Waste Printed Circuit Boards and the Shapes of Microorganisms
Sep 13, 2010
-
OFR-117-81 Application Of A Hydraulic Borehole Mining Apparatus To The Remote Extraction Of CoalBy J. B. Cheung
The results of a program to demonstrate the technical feasibility of hydraulic borehole coal mining are presented in this report. The hydraulic borehole method of coal mining involves inserting a hydr
Jan 1, 1976
-
Agglomeration for Copper Heap LeachingAgglomeration for Copper Heap Leaching Agglomeration of ore is a method which can be used to eliminate the migration of fine grained particles throughout a leach heap. Without agglomeration, fine ore
Sep 13, 2010
-
Characterising the mineralogy of iron ore sinters – state-of-the-art in AustraliaBy L Matthews, D O’Dea, P C Hayes, J Manuel, B Monaghan, T Honeyands, D Pinson, J Leedham
Many different approaches have been used in the past to characterise iron ore sinter mineralogy to predict sinter quality and elucidate the impacts of iron ore characteristics and process variables on
Jul 24, 2017
-
RI 3586 Preliminary Report On The Flotation Of Bauxite ? IntroductionBy J. B. Clemmer
This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on
Jan 1, 1941
-
RI 3586 Preliminary Report On The Flotation Of Bauxite ? Introduction (ac12c6b0-21f7-4176-bc03-aa490cce21e2)By J. B. Clemmer
This report summarizes the results of u laboratory study of the beneficiation of Arkansas bauxite by flotation. Although the investigation is not yet completed, a preliminary retort of the results on
Jan 1, 1941
-
Use Of Anchors In Floors Of Large Drydocks And Wagon Tipper Sheds ? SynopsisBy W. H. Liu
The stability of floors of large drydocks and wagon tipper sheds at coal terminals is an important matter but quite difficult to solve. Anchors can be used to join floors to foundations thus ensuring
Jan 1, 2010
-
Footwall anchoring at Smoky River Coal LimitedBy Peter L. Sheehan, David A. Fawcett, Dennis C. Martin
"Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to
Jan 1, 1988
-
The 2,600 Feet Level Exploratory Drive North at North Broken Hill LimitedCONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill
Jan 1, 1946
-
New York-New Jersey?s Mass Transit Tunnel Moves AheadBy Arthur D. Silber
The economic success and growth of any metropolitan region depends on mobility. Today, mobility between New Jersey and New York is threatened by a transportation system that cannot meet 21st century t
Jan 1, 2009
-
Investigations Into X-ray Fluorescence Analysis of Slurry Streams at Mount IsaA commercial Philips X-ray Fluorescence (X.R.F.) analyser was converted to an experimental instrument suitable for determination of the accuracy to be expected of X.R.F. on line analyses of concentrat
Jan 1, 1968
-
Geochemistry of Altered Rocks and Mass Transfer at Broadlands-OhaakiBy S F. Simmons
The Ohaaki Rhyolite and the Rautiwiri Breccia are two volcanic units occurring in the shallow and deep parts of the Broadlands-Ohaaki geothermal system. Alteration of these units by chloride waters re
Jan 1, 2002
-
Demolition of the Milwaukee Railroad Trestle Pier, Lind, WABy William C. B. Gates
Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re
Jan 1, 2016