Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)By C. Dinis da Cama
In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat
Jan 1, 1984
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
Geometallurgical Mapping: A New Approach That Reduces Technical RiskBy Jean M. Richardson, Steven R. Williams
"Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi
Jan 1, 2004
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
Problems With Rock Classification For Empirical And Numerical DesignBy Douglas Milne
Most empirical and numerical approaches to design in rock mechanics incorporate rock mass classification. Numerical design methods generally use classification values to calculate input parameters for
Jan 5, 2007
-
Rare elements in seafloor massive sulfides of the Semyenov hydrothermal cluster, Mid-Atlantic RidgeBy Georgy Cherkashov, Svetlana Babaeva, Tamara Stepanova, Firstova. Anna
Seafloor massive sulfides (SMS) study in the Russian Exploration Area at the northern equatorial Mid Atlantic Ridge began after signing the contract with International Seabed Authority in 2012. In ord
Sep 1, 2014
-
Focus on Prevention: Conducting a Hazard Risk AssessmentBy Launa G. Mallett, Jr. Brnich
Overview: The first step to emergency preparedness and maintaining a safe workplace is defining and analyzing hazards. Although all hazards should be addressed, resource limitations usually do not all
Jul 1, 2003
-
Lessons Learnt from Mine ExplosionsBy H R. Phillips
During the 1980s and early 1990s, the South African coal industry experienced a series of methane explosions in which well over 200 coal miners lost their lives. In addition, a fire and an explosion i
Aug 31, 2015
-
Grinding Mill Operation and Maintenance - Central to Asset ManagementGrinding Mill Operation and Maintenance - Central to Asset Management Since 2005, RME has pursued a vision for a new grinding plant operational paradigm, made possible by RME's latest Mill Relin
Sep 13, 2010
-
A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop CollieryBy R. Lombard
"Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po
Jan 1, 2015
-
Solid-Vapour Equilibria in the FeCl3-AlCl3-Cl2 SystemBy Moyle F. J
This paper describes an apparatus which was developed to study solid-vapour equilibria and presents results which were obtained during a study of the FeCI3-AlCI3-CI2 system. Analysis of the results sh
Jan 1, 1979
-
Long Hole Drilling Applied To Narrow Reef Mining - ObjectiveBy R. G. B. Pickering
The purpose of this report is to chronicle the interaction between Anglo Platinum and Sandvik Tamrock during the development and application of Long Hole drilling as a viable, practical method of narr
Jan 1, 2006
-
Z1600 Jameson Cell Test Rig – From Rental to RevenueBy A. Taylor, M. Blanchette, J. Doucet
"A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i
Jan 1, 2012
-
Factors Affecting Silicomanganese Production Using Manganese Rich Slag In The ChargeBy A. Ahmed, A. Fathy, M. Eissa, K. El-Fawakhry, A. El-Mohammady
Silicomanganese is widely used as a complex reducer and an alloying addition in the production of various grades of steel due to its economic and metallurgical advantages. It is also used as a semi-pr
Jan 1, 2004
-
Rapid Sensors For Ferroalloy Production And ProcessingBy A. McLean, M. Iwase, K. Wakimoto, K. Katogi
For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam
Jan 1, 2004
-
Characteristics of Gold Bearing Quartz Veins at the Historic Morning Star Mine, Preservation Inlet, Sw Fiordland, New ZealandBy D Craw, D Falconer
The Morning Star mine is one of numerous historically mined gold-quartz lodes in the Preservation Inlet goldfield of southwest Fiordland. The mine is hosted in Early Ordovician metasedimentary rocks t
Jan 1, 2005
-
The Mineral Industry Of The Islands Of The Caribbean - Bahamas (0de28902-70dd-4456-ba4e-4ad70668d526)By Doris M. Hyde
The 350,000-barrel-per-day Bahamas Oil Refining Co remained closed throughout 1986. Financially troubled Charter Oil Co., joint owner of the refinery with Chevron Oil Bahamas Ltd., agreed in principle
Jan 1, 1988
-
IC 8431 Transportation Of Mineral Commodities On The Inland Waterways Of The South-Central StatesBy Frank B. Fulkerson
Barge traffic on the Nation's inland waterways over the past 15 years has been increasing at a rate much faster than intercity freight traffic by all modes, largely due to the growing consumption
Jan 1, 1969
-
Feasibility study of electricity generation from discard coalBy A. Engelbrecht, B. North, B. Oboirien
"There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d
Jan 1, 2015
-
Gate Entry Design For Longwalls Using The Coal Mine Roof RatingBy Chris Mark
Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro
Jan 1, 1993