Search Documents

  • AUSIMM
    A Magnetic Hydrocyclone

    The concept of a magnetic hydro-cyclone is undeveloped, possibly because studies by Bragard (1965) and the Royal School of Mines in London (Robinson, 1965) were not encouraging. Its role for the conce

    Jan 1, 1984

  • IMMS
    Terrestrial Mines In The Sea: Critical Factors In Commercialising Seafloor Massive Sulphide Deposits

    By Julian Malnic

    Transplanting the steps used in exploring and developing mineral deposits on land into the marine environment will help developers. While familiar to oil and gas explorers and many other sea-based ind

    Jan 1, 1998

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • AUSIMM
    Liner Design for Improved SAG Mill Performance

    A review is presented of developments in mill liners to improve performance in terms of wear, impact, as well as mill grind and throughput. These developments are in response to the growth in size of

    Jan 1, 1999

  • CIM
    The Phase Changes of SAE 2345 Steel

    By A. Dubé

    Introduction It is common experience that on re-heating a fully martensitic steel below the Ac, point, a softer and tougher structure is formed as the tempering temperature is raised. The mechanism

    Jan 1, 1946

  • SME
    A Snapshot Of Noise And Worker Exposures In Sand & Gravel Operations

    By E. R. Bauer

    Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min

    Jan 1, 2008

  • AUSIMM
    Critical Apraisal of Pillar Design as Required by Coal Mines Regulations of India Vis-Vis Latest-Rockmechanics Formulae

    By Singh DP, Singh TN

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae. Equivalent material modelling was the appro

    Jan 1, 1992

  • AUSIMM
    Reducing total project cost in the study phase using zero base design

    By J Merrells

    Fluor, together with our clients, has yielded significant reductions in the total cost of mining projects by employing a systematic and methodical process of cost reduction. This paper outlines this s

    Jul 24, 2017

  • AUSIMM
    Augusta Gold-Antimony Mine

    By S Marshall, A Fowler

    The Augusta underground mine at Costerfield in Central Victoria has been in operation since mid 2006; however, AGD Operations Pty Ltd have explored and undertaken open pit operations in the area for o

    Jan 1, 2008

  • ISEE
    Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators

    By Michael S. Wieland

    Charge malfunction problems result from rather universal damage mechanisms and are widespread throughout surface and underground delay blasting. Recent refinements in instrumentation technology reveal

    Jan 1, 1994

  • SAIMM
    The Development Of Ultra-Fine Grinding At Anglo Platinum (d77fa80a-0be9-41fb-a558-4098934b0cba)

    By A. K. Anyimadu

    Ongoing development work on ultra-fine grinding for various applications at the Group?s concentrators has been conducted by Anglo Platinum over the last few years. Current potential applications for

    Jan 1, 2007

  • ISEE
    Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating

    By Michael Wieland

    For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t

    Jan 1, 2006

  • NIOSH
    Using Site Case Histories Of Multiple Seam Coal Mining To Advance Mine Design

    By Frank E. Chase, John L. Ellenberger, Christopher Mark

    The nature of competition in the coal market tends to deplete the most favorable coal reserves first, and forces subsequent development of mines in more extreme ground conditions such as those associa

  • SME
    Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History

    By Bob Rautenberg

    The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s

  • AUSIMM
    Present Status of Remediation of Mt Lyell Acid Drainage

    By N Clarke, R Dineen, W Jones

    The Mt Lyell copper mine in western Tasmania has discharged acid drainage (AD) into the Queen and King Rivers and Macquarie Harbour for over a century. Presently, dissolved copper loads of about 1000

    Jan 1, 2003

  • SME
    Beach Sewer Tunnel Rehabilitation ? Introduction

    By Albert Ruiz

    South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l

    Jan 1, 2008

  • SME
    Haul Truck Capacity Assurance

    By E. Carvajal I

    Large diesel engines provide the mining industry the substantial power and torque needed to move large amounts of material efficiently. But the stresses generated by such power and torque necessitate

    Jan 1, 2011

  • NIOSH
    Working Smart - NIOSH develops technology and products that address exposure to noise at the work site

    By Dana C. Reinke, David K. I Ingram

    Researchers at the National Institute for Occupational Safety and Health partnered with the water well industry to develop engi­neering control technologies and training products to address noise expo

  • NIOSH
    Computational Simulation Of A Pneumatic Chipping Hammer - Introduction

    By Ricardo Burdisso, Rahul Kadam, Kyle Schwartz, Marty Johnson

    Occupational exposure to hand transmitted vibration (HTV) arises from the hand held powered tools extensively used in the mining and construction industry such as rock drills, chipping hammers, chain

    Jan 6, 2006

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994