Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005

  • SME-ICGCM
    Geomechanical Substantiation Of Extraction Of Undermined Ore Deposit

    By M. V. Kurlenya

    The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo

    Jan 1, 1990

  • SME-ICGCM
    Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008

    By Anthony T. Iannacchione

    Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5

    Jan 1, 2011

  • SME-ICGCM
    Effect of Longwall-Induced Subsurface Deformations on Shale Gas Well Casing Stability under Deep Covers

    By Peter Zhang, Todd Minoski, Mark Van Dyke, Daniel W. H. Su

    "This paper presents the results of a 2017 study conducted by the National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Mining Research Division (PMRD), to evaluate the effects of

    Jan 1, 2018

  • SME-ICGCM
    Support of Coal Mines in the United Kingdom

    By James Arthur

    In deep coal mining the support of the underground roadway is fundamental and without knowledge of the mechanics of ground control a mine is unlikely to be operating safely and efficiently. It is the

    Jan 1, 2002

  • SME-ICGCM
    Reformation Of The Hydraulic Stowing Mining Method (81b9f573-b6ec-447f-bbcd-728c29bd41c4)

    By Liang Yinhuai

    The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover-caving and artificial mining method and the fully mechanized sublevel-caving minin

    Jan 1, 1992

  • SME-ICGCM
    Application of the Coal Mining Roof Rating System in South African Collieries

    This paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert

    Jan 1, 2001

  • SME-ICGCM
    Effect of the Approaching Longwall Faces on Barrier and Entry Stability

    By Klaus-Dieter Beck

    RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred

    Jan 1, 2004

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine

    By Yong-Ming Jiang

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992

  • SME-ICGCM
    Ground Control of a Mine Stope in Weak Rocks Subjected to High In-situ Stresses - A Case Study

    By Charlie Li

    A cut-and-fill mine stope, located at a depth of about 1000 m in a lead-and-zinc mine, was closed down because of large roof convergence and fractures appearing on the hanging wall. The instability pr

    Jan 1, 2005

  • SME-ICGCM
    Prevention. Control and Management of Coal and Gas Outbursts

    By Lu Jiam Zhang

    Coal and gas outburst is one of the serious natural disasters in the coal mines of China. Since 1950, more than 10,000 coal or gas outbursts have occurred in more than 200 underground coal mines of di

    Jan 1, 1987

  • SME-ICGCM
    Experimental and Numerical Methodology Assessment of Load Transfer Capacity of Bolts

    By Naj Aziz

    n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me

    Jan 1, 2005

  • SME-ICGCM
    Delineation Of Abandoned Workings With An In-Seam Seismic Method

    By I. Geldmacher

    In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide

    Jan 1, 1990

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam

    By Rodger Fry

    All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an

    Jan 1, 1984