    How to Design an Efficient Roof Bolting Plan Based on Simple In-Mine Measurements

    By C. J. H. Brest van Kempen

    The techniques developed should provide a useful tool, not only during the initial formulation of a suitable bolting plan for a new section, but also for periodic check¬ing on the utilization factor

    Jan 1, 1986

  • SME-ICGCM
    Investigation into the Extent and Mechanisms of Gloving and Un-mixed Resin in Fully Encapsulated Roof Bolts

    Effective strata control, utilising fully encapsulated roof bolts, is dependent on the installed quality of the reinforcement elements. One mechanism by which fully encapsulated roof bolts may become

    Jan 1, 2003

  • SME-ICGCM
    A Review of the Geomechanics Aspects of a Double Fatality Coal Burst at Austar Colliery in NSW, Australia in April 2014

    By Bruce Hebblewhite, Jim Galvin

    "A coal burst occurred on 15 April, 2014 at the Austar Coal Mine, located west of Newcastle, NSW, Australia. The burst resulted in fatal injuries to two men working as part of the mining crew at the d

    Jan 1, 2016

  • SME-ICGCM
    Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

    By Gift Makusha

    Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u

    Jan 1, 2004

  • SME-ICGCM
    Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension Problem

    By Guy Reed, Russell Frith

    "Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h

    Jan 1, 2017

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • SME-ICGCM
    Design, Construction And Performance Of A Single Pass Lining For Soft Ground Coal Mine Tunnel Entries

    By Donald P. Richards

    West Elk Coal Company operates its Mt. Gunnison No. I mine on the western slope of the Rocky Mountains in Western Colorado. The mine is located along the north fork of the Gunnisson River near Somerse

    Jan 1, 1984

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Transversely Elasto-Plastic Analysis of Surface Subsidence Arising from Longwall Mining of Inclined Coal Seams

    By M. Afsari Nejad

    A Transversely Elasto-Plastic Model was configured in FLAC (Fact Lagrangian Analysis of Continua) as a more realistic simulation of stratified and inclined strata behaviour examining surface subsidenc

    Jan 1, 1998

  • SME-ICGCM
    Change in Primary Roof Support System at Quarto Mining Company's Powhatan No. 4 Mine Results in Improved Safety, Productivity and Costs

    By Michael J. Peacock

    The Powhatan No. 4 Mine is located in southeastern Ohio along the Ohio River in Monroe County. The mine produces approximately 3.2 million tons of steam coal annually from the Pittsburgh No. 8 seam. T

    Jan 1, 1986

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Considerations Of Gas Outbursts In Using Dome Salt Mines For Storage Of Oil And Nuclear Waste

    By M. Ashraf Mahtab

    A feature of interest in stability of excavations in domal salt is the phenomenon of gas outbursts which has occurred in five of the six mines in Louisiana salt domes. Gas outbursts are sudden errupti

    Jan 1, 1981

  • SME-ICGCM
    Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian Conditions

    By Mark Colwell

    This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was

    Jan 1, 1999

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine Works

    By Thomas L. Vandergrift

    With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern

    Jan 1, 2000

  • SME-ICGCM
    Validation of Entry Stability Factors Determined By the Strength Reduction Method Against Empirical Approaches

    By Gabriel S. Esterhuizen

    The design of support for underground excavations is a complex process in which the interaction between supports and the rock mass must be evaluated. The strength reduction method (SRM) is useful beca

    Jan 1, 2013

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems

    By Robert M. Cox

    Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These

    Jan 1, 1994