Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • SME-ICGCM
    Front abutment effects on supplemental support in predriven longwall equipment recovery rooms

    By Jeffrey M. Listak

    This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u

    Jan 1, 1989

  • SME-ICGCM
    New Developments in Self Drilling Rock Bolt Technology

    By Stephen C. Tadolini, Peter A. Gray, Robert Hawker, Andrew Sykes

    "Self-drilling rock bolts (SDRBs) that use pumpable cement grout to anchor bolts have been used successfully in the tunnelling and civil engineering industries for many years. Pumpable cement grout of

    Jan 1, 2010

  • SME-ICGCM
    Technical Assessment of Subsequent Burdens due to Hard Coal Mining

    By Axel Preusse

    On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man

    Jan 1, 2008

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Optimizing Drilling Parameters for Improved Bolting Safety and Performance

    By Darin Cotton, Tim Burgess, Tim Martin

    "As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p

    Jan 1, 2015

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SME-ICGCM
    The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery

    By Clive Chadbourne

    Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s

    Jan 1, 1994

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    Monitoring Indices For The Support And Surrounding Strata System On A Longwall Face (d3af3b40-bd2b-43ab-adc6-f4c445bf5433)

    By Ming-Gao Qian

    How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of the s

    Jan 1, 1992

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Identifying Moisture Sensitive Roof Rocks in Coal Mines

    By Gregory M. Molinda

    Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M

    Jan 1, 2006

  • SME-ICGCM
    Development in Steel Roadway Support - A Track Record

    By Rudi Podjadtke

    In a short chronological review the development concepts and improvements in steel roadway support are shown. The successful standardization concept of RAG Deutsche Steinkohle and currently used suppo

    Jan 1, 2008