Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Opportunities For Continuous Mining Productivity Improvements

    By R. H. King

    The US coal industry has been using continuous room-and-pillar mining (CRPM) machines for more than 30 years for longwall development. This equipment has also been used for production mining in areas

    Jan 1, 1991

  • SME
    Noise Controls For Vibrating Screen Mechanisms

    By M. J. Lowe

    National Institute for Occupational Safety and Health (NIOSH) studies show that 43.5% of surveyed coal preparation plant workers had noise exposures exceeding the Mine Safety and Health Administration

    Jan 1, 2010

  • SME
    Cost Calculations for Mechanized Shrinkage Stoping*

    By Gordon M. Pugh, David G. Rasmussen

    INTRODUCTION Shrinkage stope mining can be employed in steeply dipping veins where both the wall and the vein material are sufficiently strong to stand with only minimal ground support. Shrinkage sto

    Jan 1, 1982

  • SME
    A Mathematical Model For Mine Fires

    By Rudolf E. Greuer, Xintan Chang

    Mine fires have always been of great concern to mining engineers and their behavior has been studied for a long time. Although an abundance of observations exist, no satisfactory mathematical model fo

    Jan 1, 1987

  • SME
    Effect Of Binder Content On The Ductility Of Cemented Hydraulic Backfill - SME Annual Meeting 2022

    By D. J. Sweet, B. Seymour, T. M. Emery, M. Armatys, J. P. Bourgeois, W. Johnson

    The Spokane Mining Research Division (SMRD) of the National Institute for Occupational Safety and Health (NIOSH) has partnered with a narrow vein, hard rock underground mine to research the effects of

    Mar 2, 2022

  • SME
    Control Strategies for Solid/Liquid Separation

    By K. C. Carriere

    INTRODUCTION The purpose of this paper is to introduce the reader to basic control strategies for solid/liquid separation in mineral processing and to indicate some of the implementation difficult

    Jan 1, 1986

  • SME
    Controlled Freezing For Temporary Ground Support

    By John A. Shuster

    INTRODUCTION Controlled ground freezing for mining and construction applications has been in use for over a century. Despite the great technological evolution which has occurred during this period,

    Jan 1, 1997

  • SME
    Problems With Underground Refuse Disposal

    By W. G. Kegel

    The past few years have produced a rash of demands for changes in America's way of doing things. From manufacturer to consumer, the rules have been changed. Some of the demands were needed and, w

    Jan 1, 1975

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • SME
    General poroelastic model for hydraulic fracturing

    By L. Cui

    X. Huang (1997) recently suggested a poroelastic model for simulating the hydraulic fracturing breakdown pressure. His paper began with a discussion questioning Haimson and Fairhurst's (H&F) mode

    Jan 1, 1999

  • SME
    The Use Of Blending Piles At Riverside Cement Company ? Introduction

    By George C. Carter

    It was just a little over three years ago that the "Go" button was pushed to start operations on the blending piles at Oro Grande. As is usual with any new installation, there were problems that had t

    Jan 1, 1962

  • SME
    Small Mining - A Perspective for Profitability

    By David J. Starbuck

    For small precious metals mining to show a comeback a different perspective must be taken than that of larger mining companies. This perspective must be much the same as that of past successful smalle

    Jan 1, 1987

  • SME
    Well Design For In-Situ Leaching

    By S. G. Axen

    Design of wells for in-situ leaching is based on individual mining operation and ore deposit requirements. Major design considerations are well flowrate, depth, fluid composition, expected well life,

    Jan 1, 1988

  • SME
    Prediction of Ground Movements for Inclined Seams

    By Ernesto Maldonado, Jesus Romero Benitez, Zach Agioutantis

    Numerous researchers worldwide have investigated the prediction of ground movements due to underground coal mining utilizing different analytical, empirical, and numerical models. These studies have

    Jun 25, 2024

  • SME
    Analysis Of Grinding Actions Of Ball Mills By Discrete Element Method

    By Katsunori Okaya, Toshio Inoue

    Application of the discrete element method incorporating the simple kinetic model of the ball-to-ball and ball-to-wall interactions enables us to visualize the details of the grinding actions prevaili

    Jan 1, 1995

  • SME
    Belt Replacement Methods for Long Conveyors

    By Allan D. Fernie

    Many long conveyors, 2 - 20 km plus, have been installed over the past 10 years. Conveyor belt life, depending on the conveyor length and material handled, will generally range from 10 - 15 years.

    Jan 1, 1993

  • SME
    Concentrating Tables for Fine Coal Cleaning

    By Charles H. Tiernon

    Separation of particles on a table deck* results from differences in specific gravity, plus a number of other interrelated phenomena: size of particles; shape of particles; stratification (consolidati

    Jan 8, 1980

  • SME
    Technology and Reagents for Waste Treatment

    By Surendra K. Mishra

    Recent land ban act has put pressure on industry to decontaminate the waste streams before they could be discharged. However, for both metal and organic contaminated wastes, there are commercial incen

    Jan 1, 1994

  • SME
    Laboratory Testing for Flotation Circuit Design

    By Barbery G., A. Maachar, M. Bourassa

    Laboratory testing for flotation circuit design is carried out on a routine basis in a large number of lab- oratories throughout the world. Usually a sample of ore, assumed to be characteristic of the

    Jan 1, 1986

  • SME
    Critical Environmental And Social Parameters Affecting The Development Of New Surface Mines

    The feasibility of exploiting a mineral deposit by developing a surface mine is closely related to the environmental protection and land reclamation costs. This issue has utmost importance for West Ma

    Jan 1, 2006