Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effect of mesophilic microorganisms on the electrochemical behavior of galenaBy J. L. González-Chávez, A. Ballester, M. L. Blázquez, F. González
In recent years, the bioleaching of sulfidic raw materials has been of great interest. However, the application of this biotechnology is now very limited for many different complex reasons. The mechan
Jan 1, 2000
-
Raise Borers Applied HorizontallyBy William T. Folwell
INTRODUCTION - CURRENT RAISE BORING PRACTICES Raise boring is a comparatively new tool to the underground mining and construction industries. Underground raise boring, in this country, had its begi
Jan 1, 1997
-
Genetic Algorithms Applied In Fleet Maintenance Analysis: Case Studies with Seven Underground Scoop TramsBy S. Peng, N. Vayenas, A. Farah
"While genetic algorithms have been widely adopted in ore grade estimation and optimization, mine design, and production scheduling in the mining engineering field, reliability and maintainability ana
Jan 1, 2015
-
Automation Scenarios Of Crushing Circuits In Mining Processes ? IntroductionBy Jouko Suominen
The basic development of various mining equipment has been strongly influenced by two objectives; improving economic results and safety aspects. Both of these factors contribute to increased requireme
Jan 1, 1989
-
Advances In The Calmef Process For Treatment Of ConcentratesBy Donn A. Calder, Wayne C. Henderson
The Calmet Process for extraction and recovery of gold and silver from concentrates and high:grade ores has been a commercial reality for over two years. During that time period, almost seventy-five d
Jan 1, 1998
-
Crosstown 7 Collector System, Milwaukee - Contract C28G11By Patrick J. Doig
The Crosstown 7 Collector System, Contract C28G11, is part of the Milwaukee Metropolitan Sewerage District's Waste Pollution Abatement Program. The contract involves the construction of 1.6 km (1
Jan 1, 1989
-
Dust Abatement Activities Within United States Steel Corporation-Coal OperationsBy R. R. Godard
The practice of dust abatement or control is not new to any operation of United States Steel Corporation. This report will review those activities, past and present, within the five operating district
Jan 1, 1967
-
Implications of shale gas well integrity failure near a longwall mine under shallow coverBy S. J. Schatzel, K. M. Ajayi, E. N. Rubinstein, Z. Khademian
This study simulates the impact of a shale gas well casing breach near a longwall mine. Field studies are conducted to measure mining-induced permeability changes over the abutment pillar of a longwal
Feb 1, 2024
-
An Innovated Self-Screwed Tube Bolting System (STBS) To Reinforce Stability Of Mine EntriesBy Xingtian Hui
Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry
Jan 1, 2009
-
Pittsburgh again hosts annual AMC coal conventionBy Tim Neil, O&apos
Acid rain legislation, the new tax package, excess coal capacity, the effects of low oil prices, how to increase coal exports: These were among the items discussed at the May 4-7, American Mining Cong
Jan 7, 1986
-
Computerized Maintenance Management Information Systems – A Valuable ToolBy Walter J. Pachucki
Mining equipment maintenance costs account for a major portion of a mine’s total operating expense. A reduction of maintenance costs while providing required equipment availability translates directly
Jan 1, 1991
-
Risk And Reward For Mining Investment In BoliviaBy W. P. Blacutt
A financial-economic model incorporating physical, market and policy variables has been developed for mining investment in Bolivia. Additional risk criteria emanating from political instability, new m
Jan 1, 1995
-
Storage And Blending By Simulation In A Steel ComplexBy A. T. Yu
The broken hill proprietary company Ltd., Australia's only steel producer, has come a long way. Since 1885 to reach today's. Capacity of 6.6 million long tons of ingot steel per year.* its N
Jan 1, 1969
-
Utilization Of Waste Dumps Of Public Power Corporation S.A. In Megalopolis Lignite CentreBy G. Triantafillou
The aim of this paper is to present the progress of the plan of the Greek Public Power Corporation S.A. (PPC S.A.) at the Lignite Centre of Megalopolis in Peloponnesus (southern Greece) to manage impa
Jan 1, 2008
-
The Effect Of Feed Source In The Hot Water Processing Of Utah Tar SandBy M. Misra
The processing strategy for the effective separation of bitumen from low grade (< 10 weight percent bitumen) Utah tar sands by a hot water process differs significantly from that used for the processi
Jan 1, 1979
-
Bentonite Binder Effective Strength (Best) Test For Unfired Iron Ore PelletsBy S. K. Kawatra, S. J. Ripke
Iron ore pellets use bentonite clay as binder at dosages from 0.5to 1.0% (10 to 20 pounds per ton) of moist iron ore concentrate. Bentonite is typically shipped hundreds of miles from Wyoming to the L
Jan 1, 2003
-
Discussion - Engineering To Reduce The Cost Of Roof Support In A Coal Mine Experiencing Complex Ground Control Problems - Khair, A. W., Peng, S. S.By K. Fuenkajorn, S. Serata
Discussion by S. Serata and K. Fuenkajorn Background Results of the above study in the August 1991 issue of Mining Engineering offer valuable lessons in the solution of cutter-roof problems. Th
Jan 1, 1993
-
ISO 9002 Is Changing Bentonite CorporationBy William J. Miles
Bentonite Corporation decided to pursue ISO-9002 Registration for our bentonite production for many reasons. We wanted to improve our current Quality System to encompass all business aspects, not just
Jan 1, 1996
-
Investigation Of Geothermal Air Heating At A Wyoming Trona MineBy Justus B. Deen, Randy Peterson
INTRODUCTION The General Chemical Soda Ash Operation located near Green River, Wyoming produces about 4.5 Mt of trona per year. In July 1989, Mine Ventilation Services Inc. performed a ventilation
Jan 1, 1993
-
Determination Of The Optimum Capacity Of Powered Roof Supports In The Longwall Face Under A Worked-Out AreaBy S. K. Das
A detailed strata-mechanics investigation and examination was carried out in the E2 Panel (ML-II/7) of the XVI Bottom coal seam, which is located in the Moonidih Colliery of B.C.C.L., Jharia coalfield
Jan 1, 1997