Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Crushing and Grinding Circuit Availability: Why Is It Important in Design, and How Can We Increase It Cost-Effectively? - SME Annual Meeting 2025By Phil Dakin, Rajiv Chandramohan, John Lo Grande, Greg Lane
Crushing and grinding circuit availability is a critical design factor defining the installed equipment selection and the process buffers required to maintain throughput during maintenance. The commin
Feb 1, 2025
-
Cost Efficient Overburden Stripping With DozersBy T. Hayes
Track-type tractors remain one of the most cost-efficient stripping tools available to coal miners. Whether they are "sweetening up" a dragline operation with pre-benching or serving as the primary st
Jan 1, 1996
-
Geology-oriented load estimation approach for underground coal minesBy Ihsan Berk Tulu, Haochen Zhao, Deniz Tuncay
The process of designing pillars and selecting support measures in underground coal mines relies highly on the accurate assessment of mining-induced loads and the load-bearing capacities of the suppor
Jun 1, 2023
-
Absorbent Clays - IntroductionBy W. F. Moll
Absorbent clays are products, usually in the form of granules, that can absorb and hold approximately their own weight of liquids while essentially maintaining their size and integrity. They always co
Jan 1, 1986
-
Tunnel Boring Machine Concept for Converging GroundBy Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass
The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig
Jan 1, 1995
-
Leaching of copper from a Nigerian chalcopyrite-rich siderite ore by ammonia-ammonium sulfate solutionsBy Alafara A. Baba, Yakubu A. Dallatu, Kehinde I. Omoniyi, Shemang Y. Chindo, Edith B. Agbaji
With the rise in global demand for pure copper, there is an urgent need to consider the processing of low-grade chalcopyrite ores. Ammoniacal leaching solutions have been reported as effective and eff
May 1, 2023
-
Validation Of Exponential Decay Blast Vibration Predictor With Case StudiesBy A. Ghosh
Commonly used predictors of ground vibration from blasting, being linear in log-log plot, do not model the underlying physics of wave attenuation. Amplitude of the wave decays with distance due to geo
Jan 1, 1991
-
Soft Fracture Grouting to Remediate Settlement Due to Soft Ground TunnelingBy Paul D. Tavares, John Forbes, Eric R. Drooff
As the existing major U.S. - Canada rail tunnel was too small to accommodate double-stack container cars, Canadian National Railways is constructing a new parallel tunnel with a 50% greater diameter.
Jan 1, 1995
-
A New Simulator For Designing Belt System Capacities In Underground Coal Mines - IntroductionBy S. D. Thompson
Since 1965 several researchers have independently developed computer models for designing gathering belt and surge bin capacities in underground coal mine belt systems. Table 1 summarizes the models a
Jan 1, 1987
-
Equivalency of PDM3700 and PDM3600 Dust Monitors - Mining, Metallurgy & Exploration (2024)By Donald P. Tuchman, Emanuele G. Cauda, Steven E. Mischler, Elaine N. Rubinstein, Jay F. Colinet
The PDM3600 and PDM3700 are two closely related person-wearable dust monitors manufactured by Thermo Fisher Scientific. Both are based on tapered element oscillating microbalance technology and provid
Feb 28, 2024
-
Update And Economic Analysis Of A Hypothetical Mexican Gold MineBy L. M. Bigler, J. L. Dobra
With the passage of Mexico's Mining Law in 1992, the tax treaty with the US in the same year, and the passage of the North American Free Trade Agreement, gold mining for non-Mexican mining compan
Jan 1, 1996
-
Overcoming Underground Mining Space ConstraintsWhen most people think of coal mining, they envision men in soot-covered clothes and hard hats digging at deposits in deep underground caverns. These mental images commonly include coal cars rumbling
-
Professional Blending Of Screen Media Delivers In Quality And ProfitsBy Florian Festge
It has been said that good things come in threes. In the case of screening for mining and quarry operations, profit comes in three distinct phases: layered, basic and sharp screening. But how good th
Jan 1, 2012
-
Kinetics Of Polymorphic Transformations In Fine Grinding ProcessesBy D. J. M. Grodzian
Polymorphic transformations taking place in grinding processes, of massicot to litharge in PbO system, and of y to a in Fe203 system, were re-investigated. Grinding was carried-on in a steeel rotatio
Jan 1, 1975
-
Karst Feature Investigation, Mitigation Design, Specification, and Contract Provisions - NAT2022By Alissa Lockett, Chris D. Breeds
Central Water Integration Project (CWIP) Segment 5-1 is the most critical segment of a regional water supply project that transfers groundwater from Burleson County to northern San Antonio, replacing
Dec 1, 2022
-
Engineering of Cooks Lane Tunnel: An overview of challengesBy V. Nasri, S. Rashidi
The Baltimore Red Line Project is a proposed 22.7-km (14.1-mile) long east-west light rail transit (LRT) line envisioned to connect the areas of Woodlawn, Edmondson Village, West Baltimore, downtown B
Jan 1, 2014
-
Division Radomiro Tomic: Its Hydrometallurgical ProcessBy Richardo Montoya
Radomiro Tomic, the new CODELCO division, is a copper deposit located at 3000 m a.s.l. and 40 Km from Calama in northern Chile. It has total oxide reserves of 802,000,000 tonnes with an average grade
Jan 1, 1998
-
Mining Management Issues Today And TomorrowBy Leonard Harris
Mining is a business and, therefore, is expected to make profit for its investors, like any other business. It is a risky business which requires the expertise of professionals from several discipline
Jan 1, 1993
-
Computerized Production Planning And Maintenance Reporting For Underground Coal MinesBy Thomas Bubanovich
Engineers at the Freeman United Coal Min¬ing Company, located in West Frankfort, Illinois, have been using a computerized production planning and maintenance reporting system, which have been designed
Jan 1, 1987
-
Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, EgyptBy Chaitanya "Teny" Mittal
INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated
Jan 1, 1989