Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Feasible Designs In The Class Of Homogenous, Countercurrent, Processing NetworksBy T. P. Meloy
A methodology is presented for finding feasible or locally optimal designs in the class of homogeneous, countercurrent, processing networks performing two-component non-sharp separations. The advantag
Jan 1, 1994
-
Raleigh-Durham International Airport, Westside Storm Water Management Facility ProjectBy L. M. Lenahan, J. D. Sheets
INTRODUCTION The Raleigh-Durham International Airport (RDU) in North Carolina is the fourth largest airport in the southeast region of the United States. The Raleigh-Durham Airport Authority is cur
Jan 1, 2005
-
Soft Rock Tunneling: Equipment Selection Concepts And Performance Case HistoriesBy Priscilla P. Nelson
Many concepts concerning equipment selection, performance prediction, and evaluation of support requirements for tunnel construction in soil or hard rock tunnels cannot be extrapolated directly for ap
Jan 1, 1987
-
A Standard Column Weathering Test To Estimate Coal Overburden Leachate Quality - Introduction - Preprint 09-086By E. F. Perry
Simulated weathering tests are used to estimate leachate quality of rocks containing varying concentrations of pyrite and carbonates at mines. This study reports the inter-laboratory results from the
Jan 1, 2009
-
Responsible coal sourcing - taking the next stepBy R. Strandahl
As one of the largest private utilities globally, E.ON currently operates hard coal fired power stations in with a total installed capacity of some 20.000 MW: These thermal power plants consume domest
Jan 1, 2011
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2By William H. Hansmire
The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during
-
Control Of Surface Movements Above Active Coal Mines In AppalachiaBy A. Jarosz
The surface manifestation of underground mining usually entails five distinct types of surface movements, which can affect or damage surface structures, facilities and renewable resources. These m
Jan 1, 1986
-
Design and construction of a surface air cooling and refrigeration installation at a South African mineImpala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum
Jan 1, 2009
-
Effect Of Ph And Electrolyte On The Stability Of Surfactant-Free Foam Films - Preprint 09-130The stability of surfactant-free foam films was studied using the thin film pressure balance (TFPB) technique. In pure water, it was not possible to produce foam films due to weak film elasticity and
Jan 1, 2009
-
Chemical Reactivity and Alteration of Pyrite Mineral in the Kubi Gold Concession in Ghana - Mining, Metallurgy & Exploration (2024)By Gabriel K. Nzulu, Lars Hultman, Per Eklund, Martin Magnuson, Abu Yaya, Prosper M. Nude, Hans Högberg
Pyrite is the most common among the group of sulfide minerals in the Earth and abundant in most geological settings. This gangue mineral in association with garnet, hematite, magnetite, and other sulf
Feb 27, 2024
-
Toward Open-Source Hardware and Software for the Mining Industry: a Case Study of Low-Cost Environmental Monitoring System for Non-Metallic Underground Mines Mining, Metallurgy and ExplorationBy Mokhinabonu Mardonova, Yosoon Choi
Open-source technology for supporting the Industry 4.0 has become the target of academic research in many sectors. This study reviewed the trends of open-source technology, its forms, and some industr
-
Toward Open-Source Hardware and Software for the Mining Industry: a Case Study of Low-Cost Environmental Monitoring System for Non-Metallic Underground Mines Mining, Metallurgy and Exploration (3a9c5e4e-b387-4996-946a-2dab73f8a3f7)By Mokhinabonu Mardonova, Yosoon Choi
Open-source technology for supporting the Industry 4.0 has become the target of academic research in many sectors. This study reviewed the trends of open-source technology, its forms, and some industr
-
Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South DakotaBy J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington
EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal
Jan 1, 2004
-
Planning And Teamwork Lead To Successful Start-Up At Batu HijauBy P. Hickey, J. Spenceley, T. J. DeMull
Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m
Jan 1, 2001
-
Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and ExplorationBy Tyler Acorn, Brandon Wilson, Jeff Boisvert
Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc
-
Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and Exploration (91c0eb25-b83e-4f9f-8ccb-a6f7d555458c)By Tyler Acorn, Brandon Wilson, Jeff Boisvert
Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Fitness-For-Purpose: Should You Buy One Grinding Mill For The Price Of Two?By P. Ulrich, V. Svalbonas
The early to mid 1980s was a period of mining consolidation, and many senior design engineers retired from the mill industry. Similar conditions have existed in the last few years. This creates a lo
Jan 1, 2001
-
Thermodynamic Evaluation Of Oleate Chemisorption At Calcium Semi-Soluble Salt SurfacesBy C. A. Young, J. D. Miller
Thermodynamic data has been obtained for oleate chemisorption at fluorite (CaF2) and calcite (CaCO3) surfaces using adsorption isotherms determined previously at room and elevated temperatures by in-s
Jan 1, 2002