Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Applicability Of Alternative Particle Size Analysis Methods In Laboratory Testing

    By M. Deal

    Particle size analysis is a fundamental measurement utilized in the mining industry, especially in comminution, hydrometallurgy, and mineral processing. While sieves and cyclosizers are the standard

    Jan 1, 2011

  • SME
    A Unified Rock Classification For Drilling And Boring

    By G. V. Krishnan, L. Adler

    A rock classification for drilling and boring is presented covering most equipment types and providing an estimation of the key parameters for operation, such as thrust and speed, and of performance s

    Jan 1, 1983

  • SME
    New Boomheading Machines (Roadheaders) Technical & Economic Integration Into Mine Development And Production

    By Howard J. Handewith

    Long used in mine development in England, Europe and Russia, roadheaders are growing in size, features, productivity and application. Beginning with the basics, this paper covers the economic and t

    Jan 1, 1983

  • SME
    New Sources Of Calcium Carbonate

    By N. C. Trivedi

    Natural calcium carbonate, commonly known as limestone is an abundant resource pretty much worldwide. Calcium carbonate occurs naturally as the main constituent of chalk, limestone, and marble. One

    Jan 1, 2002

  • SME
    A study of radon regulation and pathology as it relates to underground hardrock mining

    By D. M. Loring

    Radon progeny have been a health and safety concern for miners since the mining of radioactive minerals began. Through the ?nuclear age?, it has become better understood and the regulations have becom

    Jan 1, 2009

  • SME
    Pima Expansion IV Uses Semi-Autogenous Grind (21b5e538-7d4f-4d7f-b7fc-1b71c7d93d18)

    By John H. Bassarear

    The never ending search for lower unit costs led Pima Mining Company's management to study various alternatives shortly after Expansion III was completed. It soon became apparent that a considera

    Jan 1, 1973

  • SME
    TARP Tunnel Boring Machine Performance Chicago

    By William A. Macaitis, Frank E. Dalton, Leo R. DiVita

    The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil

    Jan 1, 1993

  • SME
    Mining Phospates in Yunnan - Potential is Great, But So Are Problems

    Recent accelerated exploration efforts in southwest China have progressively quantified the vast phosphate resources in the Yunnan Province. To date, according to Chinese geologists, potential reserve

    Jan 3, 1980

  • SME
    Upgrading Mount Royal Tunnel to Latest Standards - RETC2021

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t

    Jun 13, 2021

  • SME
    Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories

    By Stephen Phillips, Luigi P. Gonano

    Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.

    Jan 1, 1983

  • SME
    Improved Ventilation And Water Sprays Reduce Auger Mining Dust Levels

    By Robert A. Jankowski, J. Drew Potts

    The Bureau has identified several ventilation techniques and a water spray application for reducing auger mining dust levels. The dust control methods all work by improving air quantity or flow patter

    Jan 1, 1989

  • SME
    Fog Mesh Studies For Fog Removal

    By A. Martikainen

    Field tests concerning a fog mesh method for fog removal are discussed. The first tests were performed at the Pyhäsalmi Mine, Finland. As this study gave promising results, further studies were compl

    Jan 1, 2007

  • SME
    The Ivar Project - An Uncommon, Everyday TBM Tunnel

    By Yngve Jordal, Sverker Hartwig

    The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr

    Jan 1, 1991

  • SME
    A Portable Deep Learning-based Solution For Roof Fall Hazard Detection - SME Annual Meeting 2023

    By P. Lopez, E. Wellman, N. Risso, A. Anani

    Current machine learning models used for roof fall hazard prediction are mounted on expensive sensors, computationally expensive, or lack the robustness for accurate prediction in the underground mini

    Feb 1, 2023

  • SME
    Recovering Carbon From Anthracite Using Hindered Settling Column

    By J. Kim, H. Cho

    The objective of the experiment was to investigate the efficiency of hindered-settling column in recovering carbon from anthracite. Two types of Korean anthracites were prepared for feed materials. Ea

    Jan 1, 2002

  • SME
    Geological Parameters Affecting Open Hard-Rock Tunnel Boring Machine Performance

    By Taehong Kim

    An accurate and reliable prediction of Tunnel Boring Machine (TBM) performances, in terms of Rate of Penetration (ROP), utilization (U), and cutter wear rate, is a critical element in the successful p

    Jan 1, 2008

  • SME
    Ilmenite smelter freeze lining monitoring by thermocouple measurements: Model results

    By J. H. Zietsman

    Ilmenite smelting furnaces must be operated with a freeze lining of frozen slag to protect sidewall refractories from chemical attack by liquid slag. The process has two main control objectives: First

    Jan 1, 2005

  • SME
    Using Optimizing Control System At CVRD’s Pelletizing Plants

    By Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi

    Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in

    Jan 1, 2005

  • SME
    Selenium And Arsenic Removal From Mining Wastewaters

    By Phil Pennington, D. Jack Adams

    Mining and processing of minerals, metals, and fossil fuels can release selenium and arsenic into wastewaters. Both selenium and arsenic are difficult to remove to levels that meet current drinking w

    Jan 1, 2005

  • SME
    Simulation Modeling Validates Load and Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines completed a feasibility study for a new openpit gold mine in north central Nevada. The production schedule calls for a peak in material movement. This schedule is based on current op

    Jan 1, 2007