Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020

  • ISEE
    Preventing the next Terrorist Attack is a Shared Responsibility

    By Joseph Kennedy

    How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly

    Jan 1, 2010

  • ISEE
    Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations

    By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro

    Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design

    Feb 6, 2023

  • ISEE
    Mountain Mass Surrenders to Man's Initiative & Daring

    By Yogesh Narula

    Nevis Bluff Landslide - On September 17” 2000, a rockfall measuring lO,OOOm3 at Nevis Bluff, New Zealand, triggered a loday emergency. It ended when a hazardous column of rock that towered over State

    Jan 1, 2002

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members / Effects of Line or Channel Drilling on Vibration

    Hello, everyone. Way back in 1965, Devine and others at the US Bureau of Mines showed that a presplit fracture plane did not affect vibration levels transmitted across the plane (RI 6695).

    Jan 1, 2010

  • ISEE
    Benefits of Hercduct in Construction Blasting

    By Thomas C. Jones

    The purpose of this paper is to disseminate new information for nonelectric blasting in trenching and construction work. The presentation is not designed or intended to discredit conventional electric

    Jan 1, 1984

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012

  • ISEE
    Difficult Sinking Cut in Severe Winter Conditions Improves Productivity at Lac Des Iles Mines

    By Cary Moffat, John Kita, Rick Walker

    The Lac des Iles Mine, in an isolated area of NorthwesternOntario is a relatively new open pit platinum and palladium mine. They were encountering problems with the equipment and production scheduling

    Jan 1, 1996

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984

  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    Influence of Environment on Explosively Driven Shock Waves in Air

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The University of Kentucky employs an explosively driven shock tube in the course of experimentation. A good deal of the work completed relates to the verification of blast mitigation products and str

    Jan 1, 2011

  • ISEE
    Determination of Presplit Borehole Pressure

    By Dr. Paul Worsey, Dr. Calvin Konya, Dr. Anthony Konya

    Development of methods to calculate presplit blasthole pressures through simplified models, namely the Empirical Model and the Detonation Pressure Model. These models can be used with variations in ex

    Feb 1, 2020

  • ISEE
    RF Hazards to Electric Detonators – The New IME SLP-20

    By David Leidel, Beth Shimer, James Stuart

    Periodically, the Institute of Makers of Explosives Safety Library Publications are reviewed, edited and updated to reflect recent technical developments, new commercial explosive products and new reg

    Jan 1, 2012

  • ISEE
    Ore guiding in underground mining using MWD and machine learning

    By J. Sanchidrián, A. Fernández, P. Segarra

    The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi

    Jan 1, 2024

  • ISEE
    Journal: Blastserve, Look for the New Online Blasters Forum!

    Blastserve, ISEE’s Listserve is being replaced by our new Blasters Forum-online, an exclusive member benefit. Our goal is to provide an ISEE forum for you to network with your peers and exchange techn

    Jan 1, 2013

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • ISEE
    Study of Ultrafines Control in Blasting

    By A. Andrades, E. Arias, Y. Pizarro, J. Alarcón

    Division Ministro Hales - Codelco (DMH) is located at 2600 meters above sea level, 10 km north of the city of Calama, Antofagasta region, Chile. In operation since 2010, it corresponds to a porphyry

    Jan 1, 2024

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014