Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Techno-Economics of Blasting in Tunnels Using High Energy SlurriesBy Kate Satish
M/s Konkan Railways Corporation are constructing 760 kms long rail road in the Western Coastal Region of India. The rail road encounters 75 tunnels through the Western Ghats of India with a total leng
Jan 1, 1996
-
Predicting and Controlling Ground VibrationBy James W. Reil, Douglas A. Anderson
Blast vibration monitoring has generally been regarded as a necessary evil. New instrumentation and computer programs can change this. Rather than the usual trial and error methods to control vibratio
Jan 1, 1989
-
Effect of Water on ANFO/Emulsion Blends in Surface Mine Blasting (0b4347b7-0acc-4878-9511-eb82e38fb138)By Stuart Brashear, Lee Schettler
The effect of water on several ANFO/emulsion blend ratios are documented by both physical observations and analytical testing to demonstrate the effect even small quantities of water can have on water
Jan 1, 1996
-
Description of Damage Constitutive Model as Documented in Pronto3D Manual 3/89By Billy J. Thorne
The damage model in PRONTO simulates the dynamic fracture behavior of brittle rock. It is based on work started by Kipp and Grady, [lg] continued by Taylor, Chcn and Kuszmaul [I91 [20] and recently.mo
Jan 1, 1989
-
Blast Vibration and Seismograph Section - Wintertime Seismograph Set-Up BluesBy Bobby Dupree
I remember a big problem with a seismograph in the winter two years ago. In response to a citizen’s complaint I placed a transducer near the corner of a two-story home. It was a pretty nice day for th
Jan 1, 2004
-
Blasting Accidents in Surface Mines, a Two Decade SummaryBy Harry Verakis, Thomas Lobb
In the past decade, approximately 5 billion pounds of explosives were used annually in the United States. Most of this quantity of explosives was used by the mining industry and coal mining was the do
Jan 1, 2001
-
Coal Supply Engineering Audit SupplyBy John W. Gunnett
The purpose of this afternoon’s presentation is to highlight the investigative proce dures employed to complete an engineering audit of a mining operation. Skelly and Loy has been retained to perform
Jan 1, 1992
-
The Influence of Damping on Computer Simulations of Rock Motion: Computer Modeling of Gas Flow and Gas Loading of Rock in a Bench Blasting EnvironmentBy Steven D. Knudsen, Dale S. Preece
Computer modeling of the blasting process can aid in gaining an understanding of the physics controlling the process. The sequence of events in a blast occur so rapidly and in such a violent environme
Jan 1, 1992
-
An Analysis of Dragline Applications and Performances in Deep Stripping ConditionsBy Richard Curtis
Optimum Colliery is presently experiencing a shortfall of stripping capacity in order to meet its production requirements. Due to the long dragline procurement times, several alternative stripping met
Jan 1, 1990
-
Explosion Shock Separation: A New Approach in Pretreatment Technique of Lignocellulosic MaterialsBy Wang Xuguang, Tian Ruigi, Xiong Shangbin, Xiong Daiyu
Combining action features of explosive shock with those of natural lignocellulosic biomass structure, we have successfully developed a new explosive shock dilatation and separation technique for pretr
Jan 1, 1998
-
Blasting in the New Mellinnium: Safety and CredibilityA Recipe for SuccessBy Steve Dillingham
In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov
Jan 1, 2003
-
Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling ConceptBy Frank Sames
Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra
Jan 1, 1995
-
The Benefits of Electronic Blasting Systems for Use in UG Mass Pillar Blast DesignBy Felix Torres
CVRD is one of the largest mining companies in the world. Adoption of new technology and improving operational efficiency are top company priorities. Initiatives in these areas have driven continuous
Jan 1, 2003
-
Swedish Standards for Ground Vibrations and AirblastBy Roger Holmberg, Donald Jonson
The Swedish Standard SS 460 48 66, “Vibration and shock - guidance levels for blasting induced vibration limits”, is based on more than 50 years of experience from blasting close to structures and tun
Jan 1, 2005
-
"Journal: 100 Years / Annual Report of The Smithsonian InstitutionFor the Year 1914"By Edward P. O'Hern
The importance of the so-called explosives and the increasing extent of their use are evident from the fact that the production in the United States for the year 1910, as shown by the United States Ce
Jan 1, 2015
-
Using the Superposition of Seed Waveforms to Predict Seismic Effect by BlastingBy Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan
Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi
Jan 1, 2015
-
New Training Technologies (Interactive Video)By Roger Scarr, Richard A. Walker
Interactive video is the combination of computer and laser disc -technologies that allows for the storing of 54,000 single images or 30 minutes of video with the ability to access any segment or singl
Jan 1, 1990
-
Prediction of Detonation ParametersBy P D. Katsabanis
"This chapter describes the principles for the derivation of the equations for a detonation wave.. Theimportance of the equation of state for the detonation products is demonstrated and commonly used
Jan 1, 1992
-
Emissions from ExplosivesBy V. Wetzig
In the past, various investigations have been carried out at the Hagerbach Experimental Gallery under accurately reproducible conditions, in order to determine the emissions emanating from blasting op
Jan 1, 2001
-
Practical Experiences with the Use of Air-Decks in Quarry BlastingBy Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer
Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea
Jan 1, 2009