Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous Sands

    By James A. Schneider

    The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si

    Jan 1, 2006

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994

  • DFI
    Pile Integrity Testing In The Netherlands

    By Peter Middendorp

    Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int

    Jan 1, 2006

  • DFI
    Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis

    By S. L. Karunakaran

    Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number

    Jan 1, 1996

  • DFI
    Reduction Of Local Scour Around Cylindrical Bridge Piers Using Upstream Protective Piles

    By A. K. Bhattacharya

    Cylindrical bridge piers are widely used and equations exist that can predict the maximum depth of local scour around such piers. Scour around piers is an undesirable phenomenon, as it requires the fo

    Jan 1, 2009

  • DFI
    Analysis Of Static And Dynamic Horizontal Load Tests On Steel Pipe Piles

    By Pastsakom Kitiyodom

    In order to estimate the deformation and load distribution of a single pile subjected to dynamic horizontal load as well as vertical load, a simplified method of three-dimensional numerical analysis,

    Jan 1, 2006

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement Piles

    By Lisa M. Splitter

    Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill

    Jan 1, 2009

  • DFI
    Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South Australia

    By Felix Cheng

    Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust

    Jan 1, 2002

  • DFI
    Horizontal Resistance Behavior Of Pile With Wings In Sand

    By Wen Songlin

    This paper presents an experimental program to investigate the behavior of a pile with wings under horizontal loads in sand at laboratory. The work focused on evaluating the lateral resistance behavio

    Jan 1, 2007

  • DFI
    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    Little Britain Project: Construction Of Basement

    By R. H. Wright

    This paper describes the design philosophy and methods employed in constructing the foundation elements for the Little Britain Project in the City of London. The Contract is a design and construct pac

    Jan 1, 1989

  • DFI
    General Report - Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • DFI
    Steel And Concrete Piles Used In The Great Plains Of USA

    By Marius B. Wechsler

    A mathematical analysis is developed for the determination of the cases when HP-piles might be replaced by precast concrete piles. The analysis focuses especially on the "integral abutment-bridges" wh

    Jan 1, 1992

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • DFI
    The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, London

    By J. A. Yeats

    This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to

    Jan 1, 1989

  • DFI
    Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of Engineers

    By Eric C. Halpin

    "1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with

    Jan 1, 2014

  • DFI
    Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation

    By Ken Andromalos

    Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili

    Jan 1, 2007

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Compressibility Behavior Of Tropical Peat Reinforced With Cement Column

    By Y. Duraisamy

    This paper presents the compressibility of tropical peat reinforced with cylindrical cement column. When a cement column installed vertically in peat, its compressibility was reduced because of the ha

    Jan 1, 2007