Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geotechnical Exploration Phase Drilled Shaft Load TestingBy Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Practical Soil Nail Wall Design And Constructability IssuesBy Walter G. Kutschke
Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us
Jan 1, 2007
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter SewerBy Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Accessing HistoryBy Richard Pizzi
Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to
Jan 1, 2011
-
Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support SlurriesBy K. Englehardt
J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth
Jan 1, 1991
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place PilesBy Mike Muchard
Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an
Jan 1, 2000
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
Response to Load for Four Different Types of Bored PilesBy Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel ApproachBy Aly M. Mohammad
The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con
Jan 1, 2009
-
"Comparative Pile Load Tests In Alluvial Sands" - I. IntroductionBy Lawrence F. Johnsen
In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje
Jan 1, 1993
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular PilesBy Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Deep Mixing Technologies for Lateral Support SystemsBy W. Sondermann
"AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t
Jan 1, 2014
-
Kinematic Response Characteristics of a Piled Raft FoundationBy Ramon Varghese, A. Boominathan, Subhadeep Banerjee
Pile raft foundation system has been accepted as an economic foundation design for high rises and heavily loaded structures. Seismic response analysis of PR foundation systems involves complex pile-so
Jan 1, 2018
-
Application Of The Dynamic Increasing Energy Test (DIET) In Load Transfer Analysis Of Precast Piles Driven In Soft Clay FormationBy Jean Balech
This paper presents some results of dynamic loading tests performed on concrete piles driven in soft clay formation. The load transfer mechanism, measured in the dynamic increasing energy test (DIET),
Jan 1, 2002
-
Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge ProjectBy Gray Mullins
A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade
Jan 1, 2003