    Session 28 "Modeling and Verification"

    By Dawn Shuttle

    In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh

    Feb 10, 2003

  • DFI
    Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?

    By Jorj Osterberg

    550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t

    Jan 1, 2001

  • DFI
    A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPT

    By Md. Nafiul Haque, Murad Y. Abu-Farsakh, Chris Nickel

    "This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP),

    Jan 1, 2017

  • DFI
    Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay Bridge

    By Saba Mohan

    This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t

    Jan 1, 2002

  • DFI
    Session 12 "Deep Mixing Method II"

    By Helen Ahnberg

    The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora

    Feb 10, 2003

  • DFI
    Session 11 Jet Grouting II

    By George Burke

    Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w

    Feb 10, 2003

  • DFI
    Session 13 "Jet Grouting III"

    By Peter Iovino

    Unfortunately, I don't know the unit cost per cubic yard of treatment. I reflected on that yesterday and I don't think that we considered the use of micropiles. They could have been an optio

    Feb 10, 2003

  • DFI
    Use of Post-Grouted Drilled Shafts in Coastal Mississippi

    By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues

    "Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual

    Jan 1, 2015

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Driven Piles Hollow Concrete Spun Piles – The Brazilian Experience

    "Premissas BásicasCaracterísticas do concreto centrifugado(Spun concrete characteristics)Aplicação em obras de engenharia de fundações(Application engineering works foundations)Logística de fabricação

    Jan 1, 2015

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co

    Jan 1, 2010

  • DFI
    Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method

    By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki

    "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX

    Jan 1, 2015

  • DFI
    Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load Tests

    By David J. Puller

    As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river

    Jan 1, 2002

  • DFI
    Construction Of Cast-In-Place Piles With Enlarged Bases

    By H. Mori

    Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding

    Jan 1, 1989

  • DFI
    Seismoacoustic Effects Of Driving Large Diameter Piles ? Summary

    By Barry C. Roth

    Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground

    Jan 1, 2001

  • DFI
    The Quality Control Of Deep Foundation ? The New Approach By Non-Destructive Techniques ? Synopsis

    By K. S. Ho

    With the aid of the advanced electronic devices and micro-processors, the quality control of deep foundations can be carried out by Non-Destructive Tests (NDT). Three methods are presented here: the S

    Jan 1, 2010

  • DFI
    Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles

    By David T. Farber

    "Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste

    Jan 1, 2005

  • DFI
    The Effect of Helix/Wing Plate Deformation on End Bearing Resistance of Screw Piles

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "The use of steel screw piles has greatly increased in recent years because of the advancement in the installation mechanism and its performance under compressive, uplift and lateral loads. In a steel

    Jan 1, 2015