Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fresh Concrete Pressure in Cast In-Situ Bored PilesBy Matthias Pulsfort, Hanna Nissen, Markus Herten
An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke
Sep 8, 2021
-
Underpinning Using Long Minipiles In Compressible SoilsBy Mohamad H. Hussein
A minipile system was employed in underpinning a historical structure in Florida. The existing structure is founded on shallow foundations. Subsurface conditions at the project site consist of deep or
Jan 1, 1993
-
An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & ConstructionBy Abid O. Adekunte
The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing
Jan 1, 2008
-
Analogy Between Analyze Of Pile And Penetrometer Tip Resistance By Cavity Expansion MethodBy Farhad Elmi
In this paper, a new procedure is used to find the bearing capacity of single piles and cone penetration resistance in soils. Although the procedure is mainly applicable to clay and sand using any pla
Jan 1, 2002
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
Comprehensive QA/QC Integrity Testing Using Thermal Integrity ProfilerBy Brad W. Taylor
"During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable
Jan 1, 2017
-
Observing Friction Fatigue using High Strain Dynamic Pile TestingBy Ronald Damen, Dion Denes
"Friction fatigue is the loss of soil-pile friction around the shaft area of the pile. It has been observed during impact driving of piles, and has been modelled to a limited degree using physical sca
Jan 1, 1900
-
Systematic Laboratory And Field Study On The Shear Resistance Of The Soil-Concrete Interface Of Diaphragm Walls And Bored PilesBy Matthias Pulsfort, Jiarui Du, Torsten Wichtmann, Achim v. Blumenthal, Diethard König, Rowena Verst
The influence of the interaction between support fluid and soil, e.g., filter cake formation, on the shear stress transfer in the soil-concrete interface of diaphragm walls and bored piles is still co
May 1, 2022
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete PileBy K. Viking
It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered
Jan 1, 2004
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective SolutionBy Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water BridgeBy Cen Guoji
The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco
Jan 1, 1991
-
Rehabilitation of U.S. 70 Bridge over Lake HamiltonBy Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Stone Column Ground Improvement – A Trial in Silty SandsBy Ana Pereira, Naomi Norris, Donald Bruggers
The city of Christchurch, New Zealand is predominantly founded on alluvial sediments consisting of interbedded layers of loose to medium dense sand, soft to stiff silt and clay mixtures, and pockets o
Jan 1, 2019
-
Recycled Polymer Application During Pile Boring Operations: A ReviewBy Hitendrabhai S. Dewangan, Dr. Aashish A. Mehta
Pile foundation is widely used in construction of marine structures. In offshore & marine piling work, drilling/boring supporting fluid is used to stabilize the borehole (excavation) prior to tremie c
Sep 1, 2022
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Effect of Binder Composition on the Secondary Compression of an Artificially Stabilized SoilBy Monica R. Garcia, Antonio Alberto S. Correia, Paulo J. Venda Oliveira
"The aim of this paper is to analyze the creep behavior of a Portuguese soft soil stabilized with binders in one-dimensional conditions, based on oedometer creep tests. The study focuses on the analys
Jan 1, 2015
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016