Reliability Assessment of the Capacity of Single Pile Subjected to Vertical LoadingBy Rajarshi Pramanik, Nirjhar Dhang, Dilip K. Baidya
"This paper performs the reliability evaluation of pile foundation under vertical loading condition using the concept of fuzzy set theory. The uncertain parameters are expressed as fuzzy numbers. Mont
Jan 1, 2015
-
No. 1 Queens Road - Melbourne, AustraliaBy Tom George
"INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat
Jan 1, 2005
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001
-
New Insights On Detecting Flaws With Csl And TipBy Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell
In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr
Oct 1, 2022
-
Seismic Design Of Micropile Foundation SystemsBy Leo Panian
Over the last decade, drilled and post-grouted micropile foundations have come to be increasingly relied upon for resisting seismic loads in building foundations on the West Coast. Micropiles have bee
Jan 1, 2010
-
Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container ShipsBy Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013
-
Soil and Rock Nail Wall for Construction of a Subterranean AuditoriumBy Andrew Moran, William H. Walton, Matthew D. Emrick, Mary C. Nodine
"A rapidly growing company in the northern US needed a large auditorium built into a dolomite bedrock hillside. The structure required an 80-foot-deep earth retention system independent of the auditor
Jan 1, 2017
-
Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and GeogridBy Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das
"Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank
Jan 1, 2015
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
The Emergence Of The Soil-Cement Mixed Wall Technique And Its Application In 1980'sBy Osamu Taki
The innovative Soil-Cement Mixed Wall Technique emerged in Japan and obtained recognition in the engineering and construction communities in the 1980's. This technique was introduced to the Unite
Jan 1, 1990
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile DrivingBy H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
The Aged Reloading Response Of Piles In ClayBy Paul Doherty
It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou
Jan 1, 2011
-
Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep FoundationsBy Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris
Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL
Jan 1, 2019
-
Bridge Pier Remediation, New London CTBy Walter Kaeck
In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign
Jan 1, 2009
-
Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction EffectsBy Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Foundation Innovations Ensure Successful Bridge ReplacementBy Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin
"Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l
Jan 1, 2015
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Foundation Design And Construction Challenges For The Phoenix Sky Train ProjectBy John C. Niedzielski
The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill
Jan 1, 2010
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th