Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fugitive Dust Control at Porcupine Joint Venture – Dome Mine

    By John Folinsbee, Brian Danyliw, Tony Y. Chong

    "Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu

    Jan 1, 2005

  • CIM
    Application of the Woodgrove Staged Flotation Reactor (SFR) Technology at the New Afton Concentrator (48th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 2016)

    By K. Swedburg, M. Samuels

    "The New Afton concentrator was commissioned in June 2012, reaching the design milling rate in September 2012. By late 2013, through a campaign of optimization and de-bottlenecking, it was recognized

    Jan 1, 2016

  • CIM
    Vibrocone TM, Breakthrough Crushing Technology for Sustainable Development in Mining Industry

    By Hamid-Reza Manouchehri

    Mining & Sustainability? A Paradox?! ? Production: gradually or exponentially increasing (giant mining) ? Ore Grades: gradually declining, ? Open Cut Mining: now widespread, likely to be sustaine

    May 1, 2013

  • CIM
    Use of the Attainable Region Method to Optimise a Milling and Leaching Process

    By G. Danha, D. Glasser, D. Hildebrandt, N. Hlabangana

    "In this work, we apply a method known as the attainable region (AR) technique in order to optimize the milling and leaching process of a low grade gold ore. No work on the application of the AR optim

    Jan 1, 2016

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Geology and exploration history of the gold mineralization in the star lake area, saskatchewan

    By W. L. Murphy

    The Star Lake property, located 115 km northeast of La Ronge, Saskatchewan is underlain by metamorphosed andesitic tuffs and flows which have been intruded by the dioritic to granitic Star Lake Pluton

    Jan 1, 1986

  • CIM
    Slurry Rheology and Grinding

    By Alain Langlais, Caroline Boudrias Chapleau, Claude Bazin, Ahmed Bouajila

    "Slurry «viscosity» has been recognised for several decades as a variable that significantly influences the operation of grinding mills. This paper describes an instrument that can be used in a labora

    Jan 1, 2003

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Milling Investigations into the Ore as Occurring at the Lake Shore Mine

    By The Staff

    FOR forty years cyanide men have been intensively engaged on the treatment of sulpho-telluride ores. So far as we know, the processes used today were-with the important exception of the concentration

    Jan 1, 1936

  • CIM
    A Laboratory Protocol to Evaluate Potential Chemical Interferences in Flotation Circuit Applications

    By B. G. Cousins, B. O’Rourke, C. Spence

    "Some non-flotation chemistries are added to flotation circuits directly and indirectly to control issues such as scaling and dust. Since the dosage levels are generally not very large, a standard lab

    Jan 1, 2013

  • CIM
    Impact of air distribution profile on banks in a Zn cleaning circuit

    By R. Dahlke, J. A. Finch

    A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick mine concentrator to investigate the role of gas (air) superficial rate (Jg) distribution to the cells in the final Zn

    Jan 1, 2004

  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada (04913908-4a26-4595-9614-f2dc6fc1cbc9)

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminick, D. Evans-Lamswood

    "Abstract — Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwi

    Jan 1, 2012

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • CIM
    The Justification of Process Control Systems in Mineral and Coal Processing Applications

    By R. F. Hochstein, A. J. Neale, B. C. Flintoff

    "Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu

    Jan 1, 1990

  • CIM
    Canadian Steel Foundry Practice

    By S. L. Gertsman

    Canadian steel foundry practice has made marked progress during the past decade. Equipment suppliers, development engineers, and foundry personnel have focussed their attention on every phase of the f

    Jan 1, 1948

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    Overview of maintenance practices at Louvicourt mine

    By R. Hamilton

    "Louvicourt mine began operation in 1994. It is located in northwestern Quebec, 20 km east of Val d’Or. The mine is owned by Aur Resources (30%), which operates the mine, Teck/Cominco (25%) and Novico

    Jan 1, 2003