Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Inco Metals Reclamation Program

    By T. H. Peters

    The historical development of this program, dating from the construction of Nickel Park at Copper Cliff in 1917 to the various current projects carried out in the Ontario Division's program, is r

    Jan 1, 1978

  • CIM
    Combustion Synthesis of TIC/Al2O3 Composite and its Oxidation Behaviour

    By Z. I. Zaki

    Synthesis of TiC /A1203 Composite from TiO2, Al and graphite using combustion technique has been investigated at different initial temperatures; room, 400 and 600 °C. The effect of initial temperature

    Jan 1, 2007

  • CIM
    The Flash Recycle System for the Cooling of Autoclaves Process Design and Operation

    By F. Crundwell, N. Steenekamp

    "The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle

    Jan 1, 2012

  • CIM
    Development of (0.2, 0.5 and 1wt%) CNT+YSZ Ceramic Composites via Spark Plasma Sintering

    By Abhinav Karanam, Lukas Bichler

    Yttria Stabilized Zirconia (YSZ) is a promising thermal insulator for high temperature environments due to its thermal stability and chemical inertness. As was demonstrated with other technical cerami

    Jan 1, 2014

  • CIM
    Influence of Surface Roughness on the Time-Scale of Three Phase Contact Formation by Bubble Colliding with Hydrophobic Solid

    By M. Krasowska

    Dynamics of collision and kinetics of the bubble attachment to hydrophobic solid plates (Teflon) of different surface roughness were investigated. The experiments were carried out in such a way that p

    Jan 1, 2006

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • CIM
    Successful First Nation Engagement for Mine Extension: Best Practices from Highland Valley

    By George Meadows

    Consultation and Accommodation Introductions Consultation -Best Practices The Role of Negotiations The HVC Experience Summary / Conclusions The Challenge Meeting legal and policy obligations t

    May 1, 2010

  • CIM
    Mettop Process Control and Regulation System

    By I. Filzwieser, A. Filzwieser

    The Peirce Smith converter is the key metallurgical vessel in the majority of copper smelters. During the two step process, oxygen enriched air is injected through a row of tuyeres into the matte rece

    Jan 1, 2007

  • CIM
    The Flin Flon Mine : Geology and Paragenesis of the Ore Deposit

    By G. M. Brownell

    Introduction The Flin Flon mine is located on the boundary line between the provinces of Manitoba and Saskatchewan at a point about four hundred miles northwest of Winnipeg. A branch of the Canadian

    Jan 1, 1935

  • CIM
    Application and Maintenance of Hydraulic Drive Systems in Sherritt’s Concentrators

    By L. H. Smith, D. S. Taylor

    "AbstractSherritt has been applying hydraulic drives to concentrator equipment since 1967. The initial application was made on a bank of 5- by 5-in. slurry pumps. This has now been extended to all slu

    Jan 1, 1977

  • CIM
    Case History of Lost Circulation Jobs Leduc-Woodbend Field, Alberta

    By H. F. Naldrett

    "AbstractAt the end of May, 1950, Imperial Oil, Limited, had completed a total of 192 D-3 wells in the Leduc-Woodbend field, 62 of which lost circulation in the D-3 zone for periods ranging from two h

    Jan 1, 1950

  • CIM
    The Development of Mechanized Mining at Gaspe Copper Mines, Limited

    By J. C. White

    "This paper was prepared for and presented at a lecture series on ""Materials Randling"" at McGill University. The development of trackless mining at Gaspe Copper Mines, Limited is described, showing

    Jan 1, 1968

  • CIM
    Obtaining Robust Estimates of Rock Strength for Rock Engineering Design

    By J. P. Harrison, N. Bozorgzadeh, M. Dolowy-Busch

    "It is common in rock engineering practice to characterize the triaxial strength of intact rock by using only data samples of small size. Practical guidelines such as ASTM support such sample sizes. I

    Jan 1, 2015

  • CIM
    Dynamic Biomechanical Simulation for Identifying Risk Factors for Work-Related Musculoskeletal Disorders During Construction Tasks

    By J. Seo

    We propose a dynamic biomechanical simulation method that uses motion capture to evaluate the risk of Work-related Musculoskeletal Disorders (WMSDs). Statistics show that WMSDs accounted for 33% of al

    Aug 1, 2013

  • CIM
    Recent Developments in Iron Smelting and Steelmaking Processes

    By W. M. Armstrong

    THE GROWTH of the major iron and steel industries on this continent and in many European countries was based on the use of as-mined, high-grade, lump iron ores and on the availability of metallurgical

    Jan 1, 1958

  • CIM
    A user's experience with microcomputers in a mine maintenance organization

    By Gerry Roblesky

    "IntroductionWestar Mining Ltd. is Canada's largest producer of metallurgical coal for the export market. It currently operates two mines, the Balmer Mine at Sparwood, British Columbia producing

    Jan 1, 1988

  • CIM
    Geology, geophysics and geochemistry of the cullaton b-zone gold deposit, n.w.t., canada

    By John Kruse, Sethu Raman, Dave Tenney

    The Cullaton Lake B-Zone gold mine was the first gold producer in the Kaminak Subprovince of the Canadian Shield . Located approximately 650 km north of Thompson. Manitoba, the mine produced 77,783 ou

    Jan 1, 1986

  • CIM
    Scale Field Tests and Visual Modelling to Evaluate a Curved Front Dipper Concept

    By N. Shi, T. G. Joseph

    ABSTRACT: A prototype test dipper (at 1/20th volume and a geometric operating scale of 2.85) was compared during field trials against a conventional dipper with the same tare weight using the same tes

    Jan 1, 2011

  • CIM
    Air Leakage from an Underground Lined Rock Cavern for Compressed Air Energy Storage through a Rubber Seal

    By Pingyang Zhang, Caichu Xia, Shuwei Zhou, Yu Zhou, Yongsheng Hu

    A lined rock cavern (LRC) is an alternative container for compressed air energy storage (CAES) to store high-pressure air that is later used to produce electricity. A critical requirement of CAES in L

    Jan 1, 2015

  • CIM
    Oil and Gas Explorations -Eagle Plains Area, Yukon Territory

    By W. G. Campbell

    "The region discussed comprises approximately eight million acres spreading across the Arctic Circle in Yukon and North West Territories.Encouraged by four years of surface geological and geophysical

    Jan 1, 1960