Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Copper Recovery from Printed Circuit Board by CarbonisationCopper Recovery from Printed Circuit Board by Carbonisation
Sep 13, 2010
-
Circum-Pacific Suspect Terranes and Lost Microcontinents: Chip off the Old BlocksA number of terrane reconstructions conflict with global plate histories or with data from adjacent regional studies. Paleogeographic maps have ignored terranes thus are over-simplified. This pape
Jan 1, 1987
-
Coarse Gold Separation at BendigoBendigo Mining operates a 600 000 t/a comminution, gravity, flotation and leaching processing plant for the recovery of gold from their Kangaroo Flat Operation, in the Bendigo goldfields. The free gol
Aug 1, 2010
-
Modelling Bulk Density ù The Importance of Getting it RightTonnage and grade are the principal reported components of mineral resource estimates but tonnage is a derivative of two more fundamental estimates; volume and bulk density. Typically, most of the eff
Jan 1, 2000
-
Calibrating Comminution Models Using Operating Data to Forecast and Optimise Plant PerformanceBy A L. Zawadski, B G. Putland
"This paper discusses a method to build a calibrated comminution circuit model, using historic operating data and blend information that is useful for forecasting and optimising plant performance, as
Oct 10, 2016
-
Access, select, include – a review of the commercial sampling of traded bulk commodities in the context of Gy’s Theory of SamplingBy D A. Vogel
"Sampling may be mandatory for safety or environmental reasons. It may be because the value of a sale needs to be determined or to provide important data for investments. Whatever the reason, an incor
May 9, 2017
-
Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic DamBy I Thin, L Morizzi, C Seymour, G Mungur
Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,
May 9, 2016
-
Seamgas Parameters of the Kupakupa Seam, Huntly West MineBy W E. Vance, B H. Ashton
The emission of seam gases into underground workings in coal mines is acknowledged as a major hazard, particularly methane due to its possible ignition. Acknowledge of seam gas parameters is important
Jan 1, 1991
-
The Health and Safety in Employment Act 1992The need for legislative reform of health and safety legislation has been recognised in New Zealand for about a decade. Previous legislation did not cover all work places, many areas were excluded fro
Jan 1, 1993
-
Modern Gas-Power PracticeALTHOUGH it has been a matter of about one hundred years since the idea of the internal-combustion engine entered the mind of the inventor, the practical application of its use was not attained till 1
Jan 1, 1912
-
Predictive maintenance modelling for bearing-based equipmentBy Y Xie, D Willingham
Predictive maintenance (also known as ‘condition/health monitoring’) refers to the intelligent monitoring of equipment to avoid future failures. In contrast to conventional preventive maintenance, the
Jul 24, 2017
-
The Optimisation Tools for Open Pit Strategic PlanningBy Y Ren
?ptim?sgtion t?ols nos ope? 0iu ?ingc s?ch as the cche??ling and?pi? k?(i?isatTon tool{ ?ave bg?ome(?osd-dvfective way? to e?iluata open`¦it mi~e!p?n?ept as w?ll asá?}prmv?ng mine?projecW`value> ?ower
Aug 12, 2013
-
Seismic Response Prior to Spalling Failure in Highly Stressed Underground TunnelsBy E Villaescusa, A Kusui
The depth of underground mines has been increasing due to several factors, such as material demand growth and improving technology. It is a challenge to understand severe failure mechanisms such as sp
May 9, 2016
-
An Evaluation of Pricing and Allocation Methods Under the Crown Minerals Act 1991The Crown Minerals Act provides a new+framework for the management of Crown owned minerals and requires that regard be had for the principles of the Treaty of Waitangi. The Act requires the preparatio
Jan 1, 1992
-
Prohibited Activities and the Resource Management Act 1991 û Does æProhibitedÆ Mean æForbiddenÆ?By M L. van Kampen
The Resource Management Act 1991 provides for activities to be classified as permitted, controlled, restricted discretionary, discretionary, non-complying or prohibited in district and regional plans.
Jan 1, 2007
-
Comparison of Industrial Cyanide Destruction ProcessesComparison of Industrial Cyanide Destruction Processes
Sep 13, 2010
-
Dirty goethite – a geochemical characterisation of some western Robe River channel iron depositsBy C Placzek, E Beattie, K Blake
Channel iron deposits (CID) consist of ferruginous chemical sediments, and are an unusual subset of Phanerozoic ooidal ironstone deposits almost unique to the Pilbara, where they constitute around 19
Jul 24, 2017
-
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric FieldPipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Sep 13, 2010
-
The Mount Kare Gold ProjectBy Caithness SJ, Heape JMT
Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and
Jan 1, 1991
-
Australian Rock Bolt Steel Chemistry and Stress Corrosion CrackingIt's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a
Nov 25, 2010