Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast Vibration Control in hunter Valley Coal Mines

    By Moore A. J

    Control of blast vibration requires that its nature and causes be understood, and that effective control procedures be implemented to ensure compliance with limits related to the probability of dama

    Jan 1, 1995

  • AUSIMM
    Milling Practice at Mount Lyell

    The Mount Lyell Company's concentrating mill is situated about a quarter of a mile westward of the portal of the North Lyell tunnel, which serves the North Lyell, Royal Tharsis and Crown Lyell mi

    Jan 1, 1932

  • AUSIMM
    Process Control and Performance Monitoring of Argyle Diamond Mines Heavy Medium Cyclone Separation Plant

    By Hutton W, Jack G. St

    The Argyle Diamond Mines process plant incorporates a high level of computerised process control, and facilitates detailed performance monitoring. The control system was designed to provide a high

    Jan 1, 1987

  • AUSIMM
    The Ballarat East Project

    The paper outlines the philosophies and the methods applied to resource estimation by North Flinders Mines Limited at The Granites. These are based on recognition of the prime importance of quality

    Jan 1, 1990

  • AUSIMM
    The Mechanism of Xanthate Adsorption on Pyrite

    By Fuerstenau DW

    The flotation of pyrite in ethyl xanthate solutions is presented along with electrokinetic results. The results have been analysed in view of recently published thermodynamic calculations as well a

    Jan 1, 1993

  • AUSIMM
    The Possible Correlation of Major Geological Structures in the Bowen Basin, Bathymetric Contours in the Coral Sea, and Regional Seismic Activity in the North Australia

    By Mallett CW, Rynn JMW, Hammond RH

    Geological studies and satellite imagery of the Bowen Basin in Central Queensland, Northeastern Australia, have shown that the significant structural controls are a series of major North East/Sout

    Jan 1, 1987

  • AUSIMM
    Problems Encountered in the Control of Mount Isa Mine Concentrators

    By Brasnett TC

    A wide variety of problems are encountered on a day to day operating basis in the Isa Mine Concentrators. These vary from complex textural problems in the lead-zinc concentrator and their subsequen

    Jan 1, 1978

  • AUSIMM
    Titrimetric Studies on Activated Carbons

    By Kinsella B

    Titrimetric studies have been carried out on the activated carbons Kintal 1105, Norit 2520 and Kuraray 2GA. Titration curves of the carbons before and after acid and water washing and gold loading ind

    Jan 1, 1984

  • AUSIMM
    The Art of Coarse Mining

    As an Inspector of Mines in Queensland, my main responsibilities include the enforcement of the Mining Act 1968 - 1986, the Mines Regulation Act 1964 - 1983 and the Metalliferous Mining regulation

    Jan 1, 1989

  • AUSIMM
    Community Consultation In The Rehabilitation Process

    The paper looks at those factors which led the Latrobe Valley Community Forum to .focus on shortcomings of the consultative process. that existed around the 1980 period, and the limitations on the abi

    Jan 1, 1992

  • AUSIMM
    The Pertinence of Flexible Employment Practices to Fatigue Related Workplace Risk in the Mining Industry

    The purpose of this paper is to review recent approaches by regulators, employers and employees and their associations to the introduction of flexible employment practices and the management of fatigu

    Jan 1, 2003

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999

  • AUSIMM
    Field Trials of the Mobile Miner MM130 at Broken Hill

    The Mobile Miner MM130 was delivered to Broken Hill in February 1992. During March the machine was extensively trialled on the surface to test manoeuvrability, climbing ability and muck handling pri

    Jan 1, 1993

  • AUSIMM
    Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity Management

    By S D. Golding, K Baublys, V Nanjappa, C J. Moran

    Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon

    Jan 1, 2009

  • AUSIMM
    The Basement Contact Zone at Mount Isa - Its Impact on Rock Mechanics and Mine Design Philisophy

    By Struthers M. A

    The basement contact zone, a major fault structure underlying the copper orebodies at Mount Isa, has a significant influence on orebody extraction. The zone is comprised of a variety of weak, barren l

    Jan 1, 1990

  • AUSIMM
    Selective Leaching of Gold From Copper-Gold Ores Using Ammonia-Cyanide Mixtures

    By Komosa T, Muir D. M

    Mixtures of ammonia and cyanide at low concentrations leach gold selectively from copper-gold ores. The effects of various reagent compositions on three different ore types containing between 0.3 -

    Jan 1, 1991

  • AUSIMM
    Thermodynamic Study of Oxygen in Lead-Bismuth Metallic Solvents

    By Kapoor M. L

    Emf measurements on SE galvanic cell: SS; Ni-NiO I solid electrolyte/ZrO2 + CaO I [Pb + Bi]liq alloy; (PbO); SS were made in the temperature range 913-1034 K to determine the thermodynamic properties

    Jan 1, 1995

  • AUSIMM
    The Role of Sulfide Minerals and Carbon in The Pretreatment of Refractory Gold Ores with Chlorine

    By Hendrix J. L, Nelson J. H

    A study was conducted to examine how pretreatment of carbon-bearing gold ores with chlorine enhances gold recovery by cyanidation. It is hypothesized that metal species (including iron and copper) d

    Jan 1, 1991

  • AUSIMM
    Metallurgical Evaluation of an Ore Resource and its Effect on Ore Reserves

    The different stages of the metallurgical evaluation of an ore resource and their importance to overall project evaluation are described. Particular emphasis is placed on the liaison that is necessa

    Jan 1, 1987

  • AUSIMM
    Green Eyes

    Back at the turn of the century, the Eastern Goldfields region of Western Australia was entering its moment of glory. Development was going ahead at a cracking pace and miles of shaft and drives were

    Jan 1, 1993