Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Condition Monitoring and Maintenance of Underground Load-Haul-Dump Machines

    At the LKAB, Iron Ore Mine, Kiruna, Sweden a preliminary investigation into the reliability characteristics of a fleet of load-haul-dump machines has shown that the hydraulic system is one of the most

    Jan 1, 1991

  • AUSIMM
    Modelling of Shaft Displacement Due to Nearby Mining - Dome Gold Mine, Canada

    By Mandzic E. H

    The Dome Mine of Timmins Mining company is located in South Porcupine, N.W. Ontario. The orebody being mined partially lies in the No. 3 shaft pillar. Stability analysis has been carried out to est

    Jan 1, 1986

  • AUSIMM
    Mineral Exploration in the Western United States Using Visible Short-Wave Infrared and Mid-Wave Long-Wave Infrared Hyperspectral Imagers û Joint Airborne Collection Using Hyperspectral Systems (JACHS)

    By W A. Peppin, D N. Riley, N W. Schulenburg

    In June 2008, a joint airborne collection using hyperpspectral systems was tested on a single Twin Otter aircraft. This experiment was designed to incorporate two airborne hyperspectral sensors for ge

    Jan 1, 2008

  • AUSIMM
    Recoverable Resource Estimation Using Bivariate Uniform Conditioning at the Lihir Gold Mine

    By A Tomsett, R Kidd, Z Casley

    Bivariate recoverable resource estimation aims at predicting the recovered metal for a secondary variable when a cut-off is applied to a primary variable. The choice of a consistent geostatistical mod

    Jan 1, 2009

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • AUSIMM
    The Greenvale Mine and Railway

    Development of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade

    Jan 1, 1974

  • AUSIMM
    The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.

    By Howell M. W

    The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a

    Jan 1, 1940

  • AUSIMM
    Metallurigical Considerations in grade Control

    Grade control is an important factor in the on-going success of a mining operation. Grade control criteria will vary depending on the commodity being mined. Financial considerations determine the actu

    Jan 1, 1993

  • AUSIMM
    Facing up to Deviant Blastholes

    By Paley N, Cameron A, Townson P

    Although blasthole deviation is a problem which can seriously affect blasting operations, there is little practical emphasis on controlling this deviation and no practical emphasis on understanding it

    Jan 1, 1992

  • AUSIMM
    Beneficiation of Mt Weld Rare Earth Oxides by Gravity Concentration, Flotation and Magnetic Separation

    By W J. Bruckard, M J. Vaisey

    Ashton Mining Ltd (Ashton) and Lynas Corporation Ltd (Lynas) have established a joint venture partnership to develop and process rare earth oxides (REOÆs) from the Mt Weld deposit in Western Australia

    Jan 1, 2000

  • AUSIMM
    The Origin and Evolution of Australian Coal and Notes on Classification and Rank

    INDEX OF CONTENTSIntroduction.Systems of classification of coals.RankClassification of Australian coals.Defects of systems in use in other countries.Indexing by Fuel Ratio.Classification by Ultimate C

    Jan 1, 1948

  • AUSIMM
    Utilization Characteristics of Australian Steaming Coals in Overseas Power Stations

    By Juniper LA

    ERM Consultants Pty Ltd was established in 1980 for the purpose of introducing a disciplined coal technology and power station planning service, to support Australia's efforts in establishing

    Jan 1, 1987

  • AUSIMM
    No Dam Leaks: The Challenge of Blasting the Warragamba Dam Auxiliary Spillway

    By P Walton, L W. Armstrong, D P. Blair

    Sydney is the capital city of NSW and has a population of approximately four million people. Eighty per cent of the cityÆs water is supplied by Warragamba Dam, which is situated some 75 kilometres sou

    Jan 1, 2001

  • AUSIMM
    Water Use in the Mining Industry ù Threats and Opportunities

    By C Hertle, B Goebel, R Fabre

    The mining industry maintains a ælove-hateÆ relationship with water. Dewatering, aquifer, water disposal, irrigation, process water, tailings water, run-off water, seepage, leachate and sumps are all

    Jan 1, 2006

  • AUSIMM
    On-Line Bulk Analysis of Rundle Oil Shale

    By Davies K. E

    Several nuclear techniques have been assessed for application to online conveyor belt analysis of oil yield from Rundle oil shale. The most favourable technique is neutron inelastic scattering which d

    Jan 1, 1985

  • AUSIMM
    Gold Mineralisation in the Northern East Kimberley Gold District, Western Australia

    By R G Warren

    Most orebodies have cross-sections of less than 1 km2 and hence do not offer a particularly large target for exploration. Fortunately, although in the geological record ore deposits are small and ra

    Jan 1, 1994

  • AUSIMM
    Limitations in the Application of Column Flotation

    By Williams SR

    Column Flotation cannot be used indiscriminately. Based on extensive pilot plant experience at Lakefield Research, a number of limiting parameters have been identified for the application of column

    Jan 1, 1993

  • AUSIMM
    Modelling the Leaching of NaCl From Bowmans Lignite: Part 2. Multiple-Stage Leaching

    By Hall S. F, Quast K. B Newell R, Ketteridge I. B

    For the past six years research funded by the State Energy Research Advisory Commit- tee of South Australia has been conducted at the South Australian Institute of Technology, School of Mining and

    Jan 1, 1987

  • AUSIMM
    Analysis of Concentrate Operations at Mount Lyell

    By Weller K. R, Trahar W. J

    The Mount Lyell Company treats some 2.3 million tonnes of ore annually, mined from a number of orebodies on the field. Blended ore is essentially a quartz-sericite schist containing about eight per

    Jan 1, 1977

  • AUSIMM
    Modelling an Ecologically Satisfying Sustainable Global Copper Mining

    By E Drueppel, M Mistry, J Pateiro

    As mining undoubtedly influences the natural environment future challenges of copper ore mining are minimisation of land use in area and duration, proper land rehabilitation as well as tailings manage

    Jan 1, 2003